Exterior sealant/caulking abatement specs, P.S. 92M

Machine-extracted title · confidence 53%

Specifications for asbestos-containing exterior sealants and caulking materials abatement.

NYC-WTC_000454574–000454656
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SECTION 02082

In specific areas where the window components or the exterior surfaces of the beams and/or columns were tested and determined to be coated with lead-based paint, the Contractor shall be directed by the Construction Manager, to employ measures to prevent exposure to the building occupants and workers to lead contaminated dust, debris or paint chips. Refer to the f.,ead-Based Paint Specification for details.

B. The phasing and scheduling of work for this project shall be coordinated with and approved by the Resident Engineer and Eacility Manager. The Resident Engineer and Eacility Manager will make the final determination on all issues under this Contract covered by this Specification.

C. Contractor is to provide all labor, materials, equipment, services, testing, appurtenances, permits and agreements necessary to perform the work required for the abatement of ACM as required by these contract documents. All work shall be performed in accordance with this Specification, EPA regulations, OSHA regulations. New York City Eocal Eaw 70, Title 15, Chapter 1 RCNY, New York State Industrial Code 56, NTOSH recommendations, and any other applicable federal, state or local government regulations. Whenever there is a conflict or overlap of the above references the most stringent provisions are applicable.

D. These Eacilities are under the jurisdiction of the New York City Board of Education and provides services from 7:00 a.m. to 5:00 p.m. The phases and hours intended for the scheduling of the work for this asbestos abatement project has to be coordinated with the Construction Manager, Board of Education, District area representative. Schools principal or his/her representative, UET representative and the Facility Manager (School Custodian). Unless indicated elsewhere in these Specifications, all work shall be accomplished during regular working hours. It is the Contractor's responsibility to plan and schedule the work of this Contract with the approval and consent of the Construction Manager and Facility Manager.

The Contractor shall establish his working schedule in a way that avoids interference or conflict with the normal functioning of the facility. Working in the evenings and weekends shall be allowed and authorized by the Commissioner and shall be done at no additional cost to the Construction Manager.

E. The intent of this Specification section is to ensure that Contractor is responsible for the following:

1. Abatement of all ACSM, 9 Cleaning and decontamination of the entire affected area,

3. Demolition that may be required to access ACSM in each area; Contractor shall dispose of all debris associated with demolition activities as asbestos waste.

4. Removal and disposal of any other ACM found that will be directly affected by the scope of work.

5. Provide all scaffolding, platform installation, equipment, tools, transportation and any other equipment required and/or necessary to complete all work described in the Contract

02082-3

CITY_21 MCI 00_014563776

NYC-WTC_000454576

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000454576Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →