Contract specs for abatement of asbestos-containing materials at Police Academy.

NYC-WTC_000416762–000416866
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SECTION 02081

ASBESTOS ABATEMENT

Part 1 - GENERAL

1.1 DESCRIPTION

A. The Contract Documents are as defined in the "Agreement". The General Conditions shall apply to all Work of this Section.

B. Work specified herein shall be the removal and disposal of asbestos-containing materials (ACM) and asbestos-contaminated materials from designated areas of Police Academy, located at 235 E. 20* Street, N.Y. 10010.

C. The phasing and scheduling of work for this project shall be coordinated with and approved by the Resident Engineer and Facility Manager. The Resident Engineer and Facility Manager will make the final determination on all issues under this Contract covered by this Specification.

1.2 SCOPE OF WORK

A. Contractor is to provide all labor, materials, equipment, services, testing, appurtenances, permits and agreements necessary to perform the work required for the abatement of ACM as required by these contract documents. All work shall be performed in accordance with this Specification, EPA regulations, OSHA regulations. New York City Local Law 70, Title 15, Chapter 1 RCNY, New York State Industrial Code 56, NIOSH recommendations, and any other applicable federal, state or local government regulations. Whenever there is a conflict or overlap of the above references the most stringent provisions are applicable.

B. The intent of this Specification section is to ensure that Contractor is responsible for the following:

1. Abatement of all ACM,

2. Cleaning and decontamination of the entire affected area,

3. Demolition that may be required to access ACM in each area, Contractor shall dispose of all debris associated with demolition activities as ACM waste.

4. Removal and disposal of all ACM found within these areas such as pipe and pipe fitting insulation, thermal insulation, debris, etc.,

5. Provide all scaffolding, platform installation, equipment, tools, transportation and any other equipment required and/or necessaiy to complete all work described in the Contract Documents.

CAPITAL PROJECT NUMBER PO79201K 02081-4 100: CONTRACT DOCUMENTS REV. May 3,2000

CITY_21MC100_006631253

NYC-WTC_000416765

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000416765Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Compare copies and versions →