Police Academy asbestos abatement specifications, DDC

Machine-extracted title · confidence 48%

Contract specs for abatement of asbestos-containing materials at Police Academy.

NYC-WTC_000416762–000416866
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement

10. New York City Department of Environmental Protection (NYCDEP) Bureau of Air Resources 59-17 Junction Boulevard, 8* Floor Corona, New York 11368 718-595-3682

11. New York City Department of Sanitation 125 Worth Street, Room 710 New York, New York 10013 212-566-1066

12. New York State Department of Eabor (NYSDOL) Division of Safety and Health Engineering Services Unit State Office Building Campus Albany, New York 12240-0010

I. Post all applicable regulations in a conspicuous place at the job site. Assure that the regulations are not altered, defaced or covered by other materials. One copy of each regulation must also be kept at Contractor's office.

1.11 CITY/CONTRACTOR RESPONSIBILITIES

A. The normal occupants of the Work Areas will be relocated by the City prior to the performance of the abatement work and returned there to at the conclusion of the abatement work, at no cost to the Contractor. However, the Contractor shall protect all furniture and equipment in the Work Areas in a manner as hereinafter specified. In addition, the Contractor shall perform the work of this Contract in a manner that will be least disruptive to the normal use of the non-Work Areas in the building.

B. Contractor shall be responsible for cleaning all portable items not specifically addressed by the Facility, in the Work Areas, or dispose of same as contaminated waste.

C. Facility to provide Contractor with a list of items that cannot be removed and need special attention.

D. Facility to stop all deliveries that may be scheduled to the Work Area while work is in progress.

E. Facilities to have authorized personnel on site at all times or supply Contractor with means of contacting such personnel without unreasonable delay. Such personnel shall have access to all areas, have knowledge of electrical, and air handling equipment. Such personnel shall assist Contractor in case of any power failure or breakdown to shut down air supply systems, to reset and control all CAPITAL PROJECT NUMBER PO79201K 02081-29 100: CONTRACT DOCUMENTS REV. May 3,2000 - 29 -100% CONTRACT DOCUMENTS REV. 0: DATE

CITY_21MC100_006631278

NYC-WTC_000416790

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000416790Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Compare copies and versions →