NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 39/Zone I Originals
Document / 6 pages

EPA residential cleanup announcement, Lower Manhattan

Machine-extracted title · confidence 95%

Public notice from the EPA regarding dust cleanup and testing services for residents in Lower Manhattan following 9/11.

NYC-WTC_000111076–000111081

Folder label: “Zone I Originals

Page image
Scanned page image, NYC-WTC_000111077
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

' NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION

1 D A r Asbestos Control Program dnctlon Boulevard. 8°i Floor. Corona, NY 11368-51 1 Building Oe or TRU No ONLY FOR OFFICIAL USE ONLY '( ASBESTOS PROJECT NOTIFICATION (ASBESTOS INSPECTION REPORT) 1.

When submitting this form at the NYC Department of Buildings, the original form and three (3) copies with original signatures are required. Submittal at the NYCDEP requires one copy of the form with original signatures. This form must be submitted to the NYC DEP not less than one week in advance of the start of abatement activities.

I. FACILITY

/ 2. Address 1T L C t` i rwl I -eS -5 SET Borough N ' Zip _ I

AKA 3. Block I 4. Lot

5. Type of Facility 6. Name of Building II. BUILDING OWNER

7. Name ( ' AI- 12 k P J-1-1I -!'.1 ,e, G W,44-\ • ' 8. Contact Person

9. Tel. Fax #

10. Address J ~ 2SL City N ' I State Zip U000

III. GENERAL CONTRACTOR

11. Name TeI. #

IV. ASBESTOS ABATEMENT CONTRACTOR

12. Name J 1B e) p l 13. Contact Person 4-1o8 /9

14. Federal Employer ID. # PII X115. Tel. # J` 1' - 7cf -340 0 Fax # — 5i / , 3 5

16. Address Q1C7&', / — City l J 1T 1 /4 State /i ( Zip I 1? c?

V. THIRD PARTY AIR MONITOR , r 17. Name V \J 4ZE2.. -jJ6i'4 = J S PC 18. Contact Person l 4 L

19. Federal Employer ID. # 20. Tel. # ai3 - 9aa - 00j Fax # 2J3 - V P -O6 3O

21. Address . A 1, I e 7 City State____Zip 00

22. Sample Analysis Ctf1-(7lF(L ll. *6t 744 /E$, t fC. 23. NYS DOH ELAP # VI. PROJECT INI'DRMATION 24_Starting date for this portion of work O Projected completion date /4 0

Asbestos work schedule ❑ Monday 0 Tuesday ❑ Wednesday ❑ Thursday 0 Friday ❑ Saturday 0 Sunday

Shift from: ❑ am 0 pm to ❑ am 0 pm

If other, specify

Access to inspect the premises must be provided during the work schedule indicated in this item.

25. Total amount of asbestos-containing material to be abated during this work

3 Square Feet, and/or Linear Feet ACP 7 E~'a...t.ir~i V2001 Rtt;fAT £r:'$ G' tGn~

NYC-WTC 000111077

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000111077Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →