Document Cover Sheet, 94 Fulton Street, 2002

Machine-extracted title · confidence 85%

Cover sheet or identification page for records associated with 94 Fulton Street from the DEP archive.

NYC-WTC_000127588–000127592

Folder label: “94 FULTON STREET 1079210, 77/21 BN# 1079210

Page image
Scanned page image, NYC-WTC_000127589
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

~1J C,, „ ,, NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Asbestos Control Program €9-17 Junction Boulevard, 8"' Floor. Corona, NY 11368-5107 30 Val Building Dept. orTRU No ONLY FOROFFICLAI. USE ONLY TEN ASBESTOS PROJECT NOTIFICATION • (ASBESTOS INSPECTION REPORT) See fee schedule)

r1. FACILITY When submitting this form at the NYC Department of Buildings, the original form and three (3) copies with original I signatures are required. Submittal at the NYCDEP requires one copy of the form with original signatures. This form must be submitted to the NYC DEP not less than one week In advance of the start of abatement activities.

2. Address 9A R)LT044 STtgEET Borough t~+tAil Zip : 10036

AKA 3. Block 4. Lot

5. Type of Facility MtXED USE 6. Name of Building II. BUILDING OWNER

7. Name ' 8. Contact Person

9. Tel. # - Fax #

10. Address — _ City State Zip

III. GENERAL CONTRACTOR

11. Name Tel. #

IV. ASBESTOS ABATEMENT CONTRACTOR

12. Name BEN.IAM►18 KQR.ZBArs 4 So' CooTw . j*rc 13. Contact Person L.OU1 Iarapitc0

14. Federal Employer ID. # .-.-.-.-.-.-.PII -.-.-.-.-.-.- 15. Tel. #. (its)5I-2O 0 Fax # ('116) 2091808

16. Address 1248 _tat_Pit 4%JeMUE City BROoKiY 14 State MY Zip i123G

V. THIRD PARTY AIR MONITOR

17. Name WAR.R.€1 4 PANZO. EUGrt3EEs 18. Contact Person MIC~iaEL Noun. ------------------------ -, 19. Federal Employer ID. fk I 20. Tel. # (212)922-00V( •Fax# (212) 922-o630

21. Address 228 EAST_ 4SM ST2 e1 City New Ya2 - State NY Zip loniT

22. Sample Analysis Laboratory — 23. NYS DOH ELAP #

VI. PROJECT INFORMATION 24_ Starting date for this portion of work 1O'2I102 Projected completion date t I __I102..

Asbestos work schedule ® Monday ® Tuesday ® Wednesday I Thursday ® Friday ® Saturda a. . Sunday

Shift from: __e ® am ❑ pm to 8 ❑ am ® pm

If other, specity I 'y 4 j RECEIVED Access to Inspect the premises must be provided during the work schedule indicated in this item. OCT 18

25. Total amount of asbestos-containing material to be abated during this work „r► - Square Feet, and/or Linear Feet vu v '~

2/2001

tCradA t 114

NYC-WTC 000127589

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000127589Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →