Asbestos Abatement
protective systems such as alarms, sprinklers, locks, etc. The Facility shall ensure
no active air handling systems are operating within the Work Area.
F. City will not occupy the portions of the building, in which work is being
performed during the entire asbestos removal operation, including completion of
clean up.
G. Contractor shall provide a plan for 24 hours job security both for prevention of
theft and for barring entry of curious but unprotected personnel into Work Areas.
H. Should the failure of any utility occur, the City will not be responsible to the
Contractor for loss of time or any other expense incurred.
I. Facility will be responsible to notify the Contractor of any planned electrical
power shutdowns in order to ensure that there are no power interruptions in the
negative air pressure systems.
1.12 USE OF BUILDING FACILITIES
A. City shall make available to the Contractor, from existing outlets and supplies, all
reasonably required amounts of water and electric power at no charge.
B. Electric power to all Work Areas shall be shut down and locked out except for
electrical equipment that must remain in service. Safe temporary power and
lighting shall be provided by Contractor in accordance with applicable codes. All
power to Work Areas shall be brought in from outside the area through
ground-fault interrupter circuits installed at the source. Stationary electrical
equipment within the Work Area, which must remain in service, shall be
adequately protected, enclosed and ventilated. The Facility will identify all
electric lines that must remain in service. Contractor shall protect all lines.
C. Contractor shall provide, at his own expense, all electrical, water, and waste
connections, tie-ins, extensions, and construction materials, supplies, etc. All
water tie-ins shall be hard piped with polyethylene or copper piping. At the end of
each shift. Contractor shall disconnect all hoses within the work zone and place in
equipment room of the worker decontamination unit. Contractor shall ensure
positive shutoff of all water to Work Area during non-working hours.
D. Utilities:
1. General:
a. All temporary facilities required to be installed, shall be
subject to the approval of the Commissioner. Prior to
starting the work at any site; specify clearly the temporary
locations of facilities preferably with sketches and submit the
CAPITAL PROJECT NUMBER PO79201K 02081-30
100: CONTRACT DOCUMENTS REV. May 3,2000
- 30 -100% CONTRACT DOCUMENTS