SECTION 02082
D. The facility will stop all deliveries that may be scheduled to the Work Area while work is in
progress.
E. Facilities shall have authorized personnel on site at all times or supply the Contractor with means
of contacting such personnel without unreasonable delay. Such personnel shall have access to all
areas, have knowledge of electrical, and air handling equipment. Such personnel shall assist the
Contractor in case of any power failure or breakdown to shut down air supply systems, to reset
and control all protective systems such as alarms, sprinklers, locks, etc. The Facility shall ensure
no active air handling systems are operating within the Work Area.
F. The Contractor shall provide a plan for 24 hours job security both for prevention of theft and for
barring entry of curious but unprotected personnel into Work Areas.
G. Should the failure of any utility occur, the City will not be responsible to the Contractor for loss
of time or any other expense incurred.
H. The facility will be responsible to notify the Contractor of any planned electrical power
shutdowns in order to ensure that there are no power interruptions in the negative air pressure
systems.
I. Other trades that may be performing work within portions of the building, in which asbestos
abatement work is being performed shall at no time work within six bays of the asbestos
abatement work.
1.18 USE OF BUILDING FACILITIES
A. City shall make available to the Contractor, from existing outlets and supplies, all reasonably
required amounts of water and electric power at no charge.
B. Electric power to all Work Areas shall be shut down and locked out except for electrical
equipment that must remain in service. Safe temporary power and lighting shall be provided by
Contractor in accordance with applicable codes. All power to Work Areas shall be brought in
from outside the area through ground-fault interrupter circuits installed at the source. Stationary
electrical equipment within the Work Area, which must remain in service, shall be adequately
protected, enclosed and ventilated. The Facility and Construction Manager will identify all
electric lines that must remain in service. Contractor shall protect all lines.
C. Contractor shall provide, at his own expense, all electrical, water, and waste connections, tie-ins,
extensions, and construction materials, supplies, etc. All water tie-ins shall be hard piped with
polyethylene or copper piping. At the end of each shift. Contractor shall disconnect all hoses
within the work zone and place in equipment room of the worker decontamination unit.
Contractor shall ensure positive shutoff of all water to Work Area during non-working hours.
D. Utilities:
1. General:
a. All temporary facilities required to be installed, shall be subject to the approval of
02082-33