Abatement specifications, exterior sealants, P.S. 92M

Machine-extracted title · confidence 45%

CoC/documents for asbestos-containing exterior sealant/caulking materials for DDC school task force, June 2001.

NYC-WTC_000455928–000456011
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SECTION 02082 To be operated only within the allowable sound levels indicated in the code. The Contractor is required to comply with all registration requirements issued under Section 1403.2.09 for air compressors and/or paving breakers used in the performance of the work.

It shall be the responsibility of each Contractor to obtain a copy of the Noise Control Code and familiarize himself with the applicable provisions and comply therewith the provisions in the performance of the work.

K. The following conditions shall apply to all temporary shutdowns of existing services.

All temporary lighting and temporary electrical services for use in the Work Area shall be in weather proof enclosures and be ground fault protected and:

1. Shall be performed at no additional charge to the City. 2. Shall be performed at times not interfering with the other activities in the building. 3. Shall be performed only with written consent from the Commissioner and the Eacility Manager. 4. Shall be made through written request to the Commissioner at least 10 days in advance with complete written description of the work to be performed.

L. Stages of Asbestos Removal Work:

The Abatement Contractor will be required to perform the work and it is the intent of this Specification to remove all asbestos containing and asbestos contaminated materials from the Work Area(s). The Contractor is responsible for verifying all quantities of materials listed here and Bid accordingly.

M. Related Asbestos Removal Work Under Other Contracts

N. Each Contract (General, HVAC, Plumbing, Electrical) shall be responsible for the removal of incidental asbestos found prior to or during the installation of their work.

Incidental asbestos is defined as the asbestos containing material that is discovered during the course of their work that must be abated to enable them to perform the work of their Contract.

1.03 GUARANTEE

A. Work performed in compliance with this Contract shall be guaranteed for a period of one year from the date the completed work is accepted by the Department of Design and Construction.

B. The Contractor shall not be held liable for the guarantee where the repair required under the guarantee is a result of obvious abuse or vandalism, as determined by the Commissioner.

C. The Commissioner of the Department of Design and Construction will notify the Contractor in writing regarding defects in work under the guarantee.

02082-9

CITY_21 MCI 00_014563865

NYC-WTC_000455936

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000455936Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →