the lack of existing power on the floor shall be at the Contractor's expense.
G. Contractor shall provide fire protection in accordance with all State and Local
fire codes.
H. When temporary service lines are no longer required, they shall be removed by
the Contractor. Any parts of the permanent service lines, grounds and
buildings, disturbed or damaged by the installation and/or removal of the
temporary service lines, shall be restored to their original condition by the
Contractor. Senior Stationary Engineer will inspect and test all switches,
controls, gauges, etc. and shall submit a list to the Resident Engineer of any
equipment damaged by the Contractor.
I. Contractor shall supply hot shower water necessary for use in the
decontamination unit.
1.13 USE OF THE PREMISES
A. Contractor shall confine his apparatus, the storage of materials, and supplies, and
the operation of his workmen to limits established by law, ordinances, and the
directions of the Resident Engineer and the Facility. All flammable or
combustible materials shall be properly stored to obviate fire and in areas
approved by the Facility.
B. Contractor shall assure that no exits from the building are obstructed, that
appropriate safety bairiers are established to prevent access, and that Work Areas
are kept neat, clean, and safe.
C. All surrounding work, fixtures, soil lines, drains, water lines, gas pipes, electrical
conduit, wires, utilities, duct work railings, shrubbery, landscaping, etc. which are
to remain in place shall be carefully protected and, if disturbed or damaged, shall
be repaired or replaced as directed by the City, at no additional cost.
D. All routes through the building to be used by the Contractor shall first be
approved by the Resident Engineer and the Facility.
E. Attention is specifically drawn to the fact that other Contractors, performing the
work of other Contracts, may be (or are) brought upon any of the work sites of
this Contract. Therefore, the Contractor shall not have exclusive rights to any site
of his work and shall fully cooperate and coordinate his work with the work of
other Contractors who may be on (or are on) any site of the work of this Contract.
Regulated area excepted.
F. Temporary toilet facilities must be provided by the Contractor on the site.
Coordinate location of facilities with Resident Engineer. No toilet facilities will
be allowed in the Work Area.
CAPITAL PROJECT NUMBER PO79201K 02081-32
100: CONTRACT DOCUMENTS REV. May 3,2000
- 32 -100% CONTRACT DOCUMENTS
REV. 0: DATE
CITY_21MC100_006631281
NYC-WTC_000416793