Asbestos Abatement
same to the Resident Engineer for approval.
2. Water:
a. The Department of Design and Construction will furnish all
water needed for construction, at no cost to the Contractor in
buildings under their jurisdiction. All temporary plumbing or
adaptations to supply the needs of the Work Area shall be
performed and removed by the Contractor and the cost
thereof included in the Lump Sum price Bid for abatement
work.. Shower water for the decontamination unit shall be
provided hot. Heating of water, if necessary, shall be
provided by the Contractor.
3. Electricity:
The Department of Design and Construction will furnish all
electricity needed for construction, at no cost to the
Contractor in buildings under their jurisdiction. All temporary
electrical work or adaptations to supply the needs of the
Work Area shall be installed and removed by the Contractor
and the cost thereof included in the Lump Sum price Bid for
abatement work.
In leased spaces, arrangements for water supplies and
electricity must be made with the landlord. However, all
such arrangements must be made through and are subject
to approval of the Department of Design and Construction.
Utilities will be provided at no cost to the Contractor.
However, it is the Contractor's (or the General Contractor's)
responsibility to furnish and install a suitable distribution
system to the Work Area. This system will be provided at no
cost to the City.
E. Contractor shall provide a separate temporary electric panel board to power
Contractor's equipment. The Facility will designate an existing electrical source in
proximity to the Work Area. Contractor's licensed electrician shall provide
temporary tie-in via cable, outlet boxes, junction boxes, receptacles and lights, all
with ground fault interruption. At no time shall extension cords greater than 50-
feet in length be allowed. All temporary electrical installation shall be in
accordance with OSHA regulations. The electric shut down for power panel tie-in
will be on off-hours and must be coordinated with the Facility. Contractor shall
provide to the City a specification and drawing outlining his power requirements
at the pre-construction meeting.
F. Additional electrical equipment (i.e. transformers, etc.) which is necessary due to
CAPITAL PROJECT NUMBER PO79201K 02081-31
100: CONTRACT DOCUMENTS REV. May 3,2000
-31 -100% CONTRACT DOCUMENTS
REV. 0: DATE
CITY_21MC100_006631280
NYC-WTC_000416792