NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 24 pages

Permit application: NYC-WTC project, 14 Wall Street

Machine-extracted title · confidence 46%

Application prepared for project at 14 Wall Street related to WTC work.

NYC-WTC_000348464–000348487
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement Specifications - 130 Liberty, North Side

6. Tape/glue: High quality duct tape and spray adhesive glue to adequately maintain an airtight seal.

7. Hand power tools shall be equipped with HEPA filtered local exhaust ventilation.

C. Electrical Equipment: 1. The Abatement Contractor shall provide all equipment, including extensions and temporary lighting, needed to perform his work. Electrical isolation of all work areas shall be performed by the on-site electrical contractor.

2. All electrical work shall be performed by the on-site electricians in compliance with the most recent edition of the National Electric Code, unless otherwise provided by OSHA regulations.

3. The non-current carrying metal parts of fixed, portable and plug-connected equipment shall be grounded. Portable tools and appliances protected by an approved system of double insulation need not be grounded. All light and power circuits in asbestos removal areas shall be ground fault protected.

4. Extension cords shall be the 3-wire type, shall be protected from damage, and shall not be fastened with staples, hung from nails, or suspended from wires. Splices shall have soldered wire connections with insulation equal to the cable. Worn or frayed cords shall not be used.

7 5. Safe lighting equipment shall be provided with a preference for floodlights rather than indiscriminate use of unprotected lamps strung on temporary wiring. Exposed bulbs shall be guarded to prevent accidental contact. Temporary wiring shall be properly insulated and substantially supported. Circuits shall be properly designed and fused. All temporary lighting inside of asbestos removal areas shall be waterproofed.

6. Receptacles for attachment plugs shall be approved, concealed contact type. Where different voltages, frequencies, or types of current are supplied, receptacles shall be of such design that attachment plugs are not interchangeable.

D. Ladders, Scaffolds and/or Staging: 1. The Asbestos Contractor shall supply OSHA-approved ladders, scaffolds and staging in sufficient quantity to ensure that all work surfaces can be easily and safely reached by workers and inspectors. Scaffolding may be suspension type or standing type and must comply with all applicable federal, state and local regulations and codes.

G:\2002\220201 130 Liberty DEUTSCHE BANK acm\220201 North Spec.doc 12

CITY_DEP_WORBY_CANNATA_SUBP_000031420

NYC-WTC_000348479

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000348479Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000416762

Contract specs for abatement of asbestos-containing materials at Police Academy.

Similar indexed content

Compare copies and versions →