NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 50/130 CEDAR STREET
Document / 74 pages

Asbestos abatement technical specifications, 130 Cedar Street, July 2004

Machine-extracted title · confidence 100%

Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.

NYC-WTC_000125579–000125652

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125625
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement Technical Specifications For 130 Cedar Street, New York, NY 5. At the base of the building, directly below the parapet wall to be • abated, a restricted area shall be established. This space shall be plasticized with one (1) layer of 6-mil plastic from 6 inches up the building exterior wall to the edge of the sidewalk at least 5 feet away. It shall be cordoned off with clearly identified asbestos hazard tape. At the end of each shift, the plastic shall be cleaned, removed, and disposed as asbestos waste.

6. The remote DES shall be constructed in accordance with Attachment D and shall be erected on the roof of the building. This unit shall be maintained in the work place for the duration of the abatement.

7. Each work area shall be supplied with appropriate tools, rags, a portable supply of amended water and a HEPA vacuum. After the ACM coping stone caulking is adequately wetted It shall be stripped using hand tools. The stripped joints shall be HEPA vacuumed and wet wiped to remove any loose debris still in place or on the polyethylene. All exposed joints shall be coated with a clear encapsulant.

8. All ACM shall be bagged directly upon detachment from the substrate.

9. One (1) area sample per shift shall be taken in the work area during removal. A minimum of three (3) samples for small projects and a minimum of five (5) samples for large asbestos project shall be • collected.

10. Personnel performing the work shall be NYS/NYC certified asbestos handlers. A NYS/NYC certified asbestos handler/supervisor shall be in the work place at all times during the ACM tar abatement. The asbestos supervisor shall establish and maintain a log as required in 15 RCNY.

11. Upon completion of the stripping work, the parapet wall surfaces shall be cleaned and HEPA vacuumed to ensure no visible ACM debris in the work area. All plastic shall be removed and properly disposed of as asbestos waste.

12. All tools shall be wet cleaned then HEPA vacuumed and removed from the work area upon completion.

13. The work area shall be allowed to dry completely before the visual inspection is conducted. This inspection, to be performed by the independent third party air monitoring firm/consultant, shall confirm the absence of ACM or debris in the work area prior to the removal of the hazard tape/barriers.

8.5 Removal of Exterior Window Caulking, Exterior Door Caulking, Spandrel Flashing and Window Lintel Caulking.

Prepared by JLC Environmental Consultants, Inc. Project No. 04-3271 Page 47

NYC-WTC 000125625

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125625Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127738 · Box DEP Box 52

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

Cited alongside this record in an Ask answer

Compare copies and versions →