Permit application: NYC-WTC project, 14 Wall Street

Machine-extracted title · confidence 46%

Application prepared for project at 14 Wall Street related to WTC work.

NYC-WTC_000348464–000348487
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement Specifications - 130 Liberty, Nortb Side

F. Work hours will be confirmed by the Client. Nominal work hours are 24 hours a day, seven days a week.

G. All footage calculations and conditions are approximate and must be verified on site by the Abatement Contractor. n

H. The Abatement Contractor shall be responsible for all city, state and federal filings (including variances) and associated fees.

4. MATERIALS AND EQUIPMENT A. General: l.-A0Tning''aBaternent activities, replacement materials shair Bc skjrcd 'oulsuic' llie vvork aitoa in a mauner thal prcvcnts contamination.... ,

2. The Abatement Contractor shall bring only properly decontaminated and cleaned equipment to the worksite for use. Contaminated equipment will not be allowed on the site.

3. All equipment (ladders, scaffolds, negative air units) shall be properly decontaminated and/or wrapped and sealed in two layers of 6-mil polyethylene sheeting prior to removal from the Work Arca(s).

B. Abatement Materials Requirements: Include but are not limited to:

1. Wetting agent: A mixture of (50% Polyoxyethylene Ester and 50% Polyoxyethylene Ether) in a concentration of 1 ounce to 5 gallons of water. The Abatement Contractor must submit a material data safety sheet on the product used to the Client. 2. HEPA V ac Liums: The system shall be in proper working order and provide filtration to 99.97% for particles with a mean aerodynamic diameter greater than 0.3 pm. In addition, the Abatement Contractor shall have on hand appropriate attachments for cleaning floors, crevices, etc. 3. Polyethylene Sheeting: Shall be of a 6-mil minimum thickness, fire retardant and in a size appropriate to minimize seams and non-movable equipment. 4. Polyethylene Bags (6-mil minimum thickness): To provide air/water tight seal for disposal of waste material and labeled in accordance with OSHA Regulation 29 CFR 1926.58K(2) and current NESHAPS Regulations Section 61.150(v) and all applicable USDOT regulations. 5. Appropriate tools: For scraping and removing all asbestos waste from the removal site, (i.e., scrapers, tin-snips, .plastic shovels)

G:\2002\220201 130 Liberty DEUTSCHE BANK acm\220201 North Spec.doc 11

CITY_DEP_WORBY_CANNATA_SUBP_000031419

NYC-WTC_000348478

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000348478Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000416762

Contract specs for abatement of asbestos-containing materials at Police Academy.

Similar indexed content

Compare copies and versions →