NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 24 pages

Permit application: NYC-WTC project, 14 Wall Street

Machine-extracted title · confidence 46%

Application prepared for project at 14 Wall Street related to WTC work.

NYC-WTC_000348464–000348487
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement Specifications - 130 Liberty, North Side

Acceptance Criteria; Decontamination of the work site meets the requirements of this test when every work area sample indicates an airborne concentration of fibers of less than 70 structures per millimeter squared. If any sample is above this clearance level, then the 1 decontamination is incomplete and the work area shall be re-cleaned.

2.13 PREVENTION OF RECONTAMINATION

To deter recontamination of the north side area after successful clearance testing, the contractor shall confirm (and replace) all critical barriers along the north barrier wall. Further, the tunnel from car #24 to the north sid'eharnerwall shall remain in place. y ' ' -*

3. GENEIUL CONDITIONS ^4,) e cla’--'. A. All removal shall be performed utilizing feH—eoatainment/g-ross Ternoval procedures as required by NYCDEP Title 15, NYSDOL ICR 56 and in accordance with all other applicable federal, state and local regulations. All ACM shall be wetted using amended water prior to removal.

B. Water hookups to be provided by the Abatement Contractor and to be coordinated with the Client.

C. Contractor shall deliver sufficient ground fault interrupt service (GFI) panels to the site. Panels shall meet the requirements of applicable provisions of the National Electric Code. The panels shall be connected by the on-site electrical contractor. The on-site electrical contractor shall be responsible for any and all standby electrician costs as required by the Scope of the Work. The contractor shall assure that all full-containment areas shall be equipped with sufficient temporary GFI electrical and hghting installation to accommodate the Scope x>T the Work as indicated in this document, including all air sampling outlets.

D. The Abatement Contractor shall provide temporary lighting in all Work Areas, decontamination units and staging areas for the duration of the project shall maintain temporary lighting and circuits. All temporary lighting shall be GFI service. In addition, all air sampling locations shall be provided with temporary lighting and power as per the Environmental Consultant’s requirements.

E. All waste to be transported shall be doubled-bagged and properly labeled.

G;\2002\220201 130 Liberty DEUTSCHE BANK acm\220201 North Spec.doc. 10

CITY_DEP_WORBY_CANNATA_SUBP_000031418

NYC-WTC_000348477

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000348477Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000416762

Contract specs for abatement of asbestos-containing materials at Police Academy.

Similar indexed content

Compare copies and versions →