Asbestos Abatement Specifications - 130 Liberty, North Side
B. In the event that release criteria is not met, all costs associated with re
testing and re-cleaning shall be home by the contractor
C. Clearance Air and Surface Monitoring and Analysis for Metals;
a) Acceptance Air Clearance Criteria: Decontamination of the work
site, solely for purposes of allowing replacing structural elements of
the building, will be met when the following airborne concentrations
are achieved in every work area sample. If any sample is above
these levels, then the decontamination will be considered
incomplete and the work area re-cleaned.
Metal Clearance Level fng/m^)
Cadmium 1.0
Chromium 50.0
Copper 100.0
Nickel 150.0
Zinc 1000.0
b) Acceptable Surface Clearance Criteria; Samples in remediated areas
will be taken using a commercially available non-alcohol sterile
wipe. The wipe will meet the specifications of ASTM E 1792.
Sampling occurs by wiping in one direction, using a 1 square foot
template, folding the swab in half and wiping the entire area at a 90°
angle from the first wipe, folding the swab in half again and wiping
the entire area one more time at a 90° angle from the second wipe.
Clearance for purposes of this protocol will be achieved if the
following levels are achieved;
Metal Clearance Level tiig/fl~)
Cadmium 0.9
Chromium 46.5
Copper 93.0
Lead 40.0
Nickel 140.0
Zinc 930.0
If any sample exceeds any of the above these clearance levels, then
the decontamination shall be considered incomplete and the work
area or the documents are to be re-cleaned.
D. Clearance Air Monitoring and Analysis by TEM
G:\2002\220201 130 Liberty DEUTSCHE BANK acm\220201 North Spec.doc 9
CITY_DEP_WORBY_CANNATA_SUBP_000031417
NYC-WTC_000348476
OCR can misread numbers and units. Confirm readings against the page image before using them.