Asbestos Abatement Specifications - 130 Liberty, North Side
C. Prior to exiting the enclosure(s), handlers shall remove their disposable suit(s) and
proceed directly to the Decontamination Unit shower room, where full
decontamination procedures shall be performed (i.e. showering).
D. Personal air monitoring of all workers in accordance with OSHA regulations is
the sole responsibility of the Abatement Contractor.
2.10 DISPOSAL REQUIREMENTS
All asbestos waste including the containment plastic, all plastic sheeting utilized in
critical barrier construction, disposable suits and any other debris deemed contaminated
by the Environmental Consultant, shall be wet with amended water then placed in clean 6
mil plastic ACW bags. These bags shall be wet wiped and/or HEPA vacuumed. Each bag
shall then be placed in an additional properly labeled, clean 6-mil plastic ACW bag and
sealed airtight. All bags shall be affixed with identification labels indicating site of origin,
date and the Owner’s name.
Storage, transport and disposal of the waste bags shall be in accordance RCNY-TitieU,
Chapter 15; USEPA NESHAPS regulations, as revised; and applicable USDOT . ' "■s A"
regulations.
2.11 AMBIENT AIR MONITORING
Air monitoring shall be conducted by the Environmental Consultant, except OSHA-
mandated personal air monitoring of abatement workers which shall be the responsibility
of the Abatement Contractor. Ambient air samples shall be collected before, during and
after the abatement work is completed. Samples collected during the work shall be
analyzed using NIOSH 7400 protocol with <0.0T fibcrs/cm ’ as the acceptable threshokh
level, unless background fiber concentrations are greater. If any ambient air sampler
equal or exceed 0.01 f ee or the background levels, all work shall stop'^fflF^-af&as
in si fl o -a4M4 acliacent atamgHTWa te-wgt wiW AU air
monitoring wiU be conducted in accordance with applicable sections of RCNY Title 15,
Chapter 1.
2.12 WORK AREA CLEARANCE
A. The work area is cleared for replacement of structural componentexn the
building when it is visually clean and clearance aitaa«riBB»i(J^testing
indicates that concentrations have been reduced to the levels specified
below.
G:\2002\220201 130 Liberty DEUTSCHE BANK acm\220201 North Spec.doc 8
CITY_DEP_WORBY_CANNATA_SUBP_000031416