NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 24 pages

Permit application: NYC-WTC project, 14 Wall Street

Machine-extracted title · confidence 46%

Application prepared for project at 14 Wall Street related to WTC work.

NYC-WTC_000348464–000348487
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement Specifications - 130 Liberty, North Side

fv D. In each full eentamment, the Abatement Contractor shall maintain a minimum of six (6) imits. The Abatement Contractor shall also maintain @a6h~.£ill cdiiLuument a sufficient number of spare units that can be immediately used in the event of the failure of one or more negative air units not resulting from a power outage or other outside cause.

F. If loss of electric power should occur, abatement shall stop immediately until power is restored.

Power failures longer than one half hour will require;

• Decontamination units sealed after evacuation of workers • All adjacent areas will be monitored for fiber contamination.

2.8 PROJECT PHASING All proposed phasing by the abatement contractor shall be submitted to Ambient Group, Inc. with this bid (and shall be approved by the owner) prior to the start of any work for review and approval by Ambient Group, Inc. and Cushman and Wakefield, Inc.

2.9 WORKER PROTECTION All workers shall be certified asbestos handlers and shall bring to the Work Area and present for inspection each day their handler certificate, copies of documentation indicating successful completion of their initial training courses and any necessary refresher courses and copies of their most recent medical evaluation.

___ Asbestos Handlers entering the enclosure(s) shall:____________________________ A. Remove all street clothes and don disposable suits (provided by the Abatement Contractor) at the Worker Decontamination facility, then proceed directly to the Work Area.

B. Wear appropriate NIOSH-approved HEPA filter personal respiratory equipment, as deemed necessary by the work being performed.lFull-facey-pogitive-p'ressuge-aii;.,

enclosures. Nvgattvc'qwessi-HV--uv"Si'niLnors shall he‘''al1nwcd' fbr -prci-wahoii activities only.

G:\2002\220201 130 Liberty DEUTSCHE BANK acm\220201 North Speadoc 7

CITY_DEP_WORBY_CANNATA_SUBP_000031415

NYC-WTC_000348474

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000348474Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000416762

Contract specs for abatement of asbestos-containing materials at Police Academy.

Similar indexed content

Compare copies and versions →