NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 24 pages

Permit application: NYC-WTC project, 14 Wall Street

Machine-extracted title · confidence 46%

Application prepared for project at 14 Wall Street related to WTC work.

NYC-WTC_000348464–000348487
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement Specifications - 130 Liberty, North Side

C. Closed conduit.

2.5 PARTITIONS The Abatement Contractor shall ensure that structural partitions are built to separate the full-containment Work Area(s) from non-work areas in all openings larger than 32 square . feet except where any one dimension is one foot or less. 5^4 5

artitions shall be constructed of: a. Conventional 2" x 4" (minimum) fire-retardant wood or metal stud framing, maximum 16" center-to-center spacing. b. Fire-retardant plywood or other solid material of at least 3/8" thickness shall be applied to the work side of framing. c. Partitions shall be caulked and sealed at all joints and seams.

Prior to the erection of partitions, the ACM that will be disturbed during this activity will be: a. Treated first with amended water and removed using wet method and/or by tent procedures as deemed appropriate by the Environmental Consultant. b. Removal by these procedures is limited to a maximum of a one-foot wide strip running the length of the partition. c. The area will be monitored during this procedure.

2.6 PLASTICIZING The^ly -pfagtltteafimTWitl br critical barriers.^^

2.7 ENGINEERING CONTROLS Prior to mobilization, the Abatement Contractor shall submit to the Environmental GQnsjiltant„the^manufacturer ’s.sp^cLficatimLof e^h modeLof negative air unit to_ be utilized on the project.

The Abatement Contractor shall provide for and be responsible for the following:

A. Negative air units shall be continuously monitored for proper operations and maintenance of filters. .t .4 (4 €

B. Negative air units shall utilize a dedicated power source. Multiple units shall be turned on one by one to ensure that integrity of plastic barriers is maintained.

C. Negative air units shall run continuously from begiiming of isolation until successful air clearance results have been obtained.

G:\2002\220201 130 Liberty DEUTSCHE BANK acm\220201 North Spec.doc 6

CITY_DEP_WORBY_CANNATA_SUBP_000031414

NYC-WTC_000348473

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000348473Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000416762

Contract specs for abatement of asbestos-containing materials at Police Academy.

Similar indexed content

Compare copies and versions →