NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 24 pages

Permit application: NYC-WTC project, 14 Wall Street

Machine-extracted title · confidence 46%

Application prepared for project at 14 Wall Street related to WTC work.

NYC-WTC_000348464–000348487
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement Specifications - 130 Liberty, North Side

Units shall be positioned to exhaust into the tunnels, thereby placing this area under positive pressure in relation to the work area.

E. Install cr/m^^^ barriers in accordance with NYC DEP Title 15, Chapter 1. FL' TiV’-Tfean tlic w oi^ according to NYC DEP Title 15, SiapterrW*SBcfio»424,^ of this doeument. G. Insure that the work areas are adequately separated from non-work areas with partitions in accordance with NYC DEP Title 15, Chapter 1 and.Section 2.6 of this document. r . vgo r-x:5 V €■ SSAa-'g;., . H. HVAC ductwork shall be cut and blanked prior to beginning any asbestos abatement. Access to the ducts shall be at the point where ducts enter the north side of the through the north barrier wall. I. Remove all wiring from the under floor cell system within the work area. The _ p owner will designate the location where the wires will be cut outside of the work area. J. Perform asbestos removal accordance with NYC DEP Title 15, Chapter 1 including *41 specified by tire NYC DEP. K. Upon completion of the abatement, clearance criteria shall be met according to Section 2.13 of this document.

2.3 FULL CONTAINMENT WORKER AND WASTE DECONTAMINATION FACILITIES y ''2 Contractor shall confirm that the pviating dcconiami nation facilities located injhe^arkittg” level area are in compliance witfe-NYt DEP Title 15, Chapter l.<4fEl?A ventilation "hv- 2 - equipment shall be placed in a manner to provide an even distribution of airflow through both the worker and the waste decontamination units../fhc' ^rrHow-^^attepas.-shali^ cbeekecl by ihe Abatcrricut Contractor via smoke tcsling at'the beginning of cach shill. •• A . 1 V ... COS-v 'Sv O '*■ ■'' O V-fc' '■ gOr'"’ f'i. 2.4 StoCLEANING REQUIREMENTS A combination of wet methods and use of HEPA vacuum equipment will be used to pre­ clean all objects and surfaces within the proposed work area. Dry methods such as dry sweeping shall not be allowed. When entire area has been thoroughly cleaned, the Abatement Contractor shall request and pass a-pfe-set&ig inspection before advancing to the next step in the abatement process.

Items to be cleaned include, but may-RCrt be limited to, the following; A. Sprinkler Piping. B. Class “E” wiring.

G:\2002\220201 130 Liberty DEUTSCHE BANK acm\220201 North Spec-doc 5

CITY_DEP_WORBY_CANNATA_SUBP_000031413

NYC-WTC_000348472

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000348472Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000416762

Contract specs for abatement of asbestos-containing materials at Police Academy.

Similar indexed content

Compare copies and versions →