Units shall be positioned to exhaust into the tunnels, thereby placing this area
under positive pressure in relation to the work area.
E. Install cr/m^^^ barriers in accordance with NYC DEP Title 15, Chapter 1.
FL' TiV’-Tfean tlic w oi^ according to NYC DEP Title 15, SiapterrW*SBcfio»424,^
of this doeument.
G. Insure that the work areas are adequately separated from non-work areas with
partitions in accordance with NYC DEP Title 15, Chapter 1 and.Section 2.6 of
this document. r .
vgo r-x:5 V €■ SSAa-'g;., .
H. HVAC ductwork shall be cut and blanked prior to beginning any asbestos
abatement. Access to the ducts shall be at the point where ducts enter the north
side of the through the north barrier wall.
I. Remove all wiring from the under floor cell system within the work area. The _ p
owner will designate the location where the wires will be cut outside of the work
area.
J. Perform asbestos removal accordance with NYC DEP Title 15, Chapter 1
including *41
specified by tire NYC DEP.
K. Upon completion of the abatement, clearance criteria shall be met according to
Section 2.13 of this document.
2.3 FULL CONTAINMENT WORKER AND WASTE DECONTAMINATION
FACILITIES
y ''2
Contractor shall confirm that the pviating dcconiami nation facilities located injhe^arkittg”
level area are in compliance witfe-NYt DEP Title 15, Chapter l.<4fEl?A ventilation
"hv- 2 -
equipment shall be placed in a manner to provide an even distribution of airflow through
both the worker and the waste decontamination units../fhc' ^rrHow-^^attepas.-shali^
cbeekecl by ihe Abatcrricut Contractor via smoke tcsling at'the beginning of cach shill.
•• A . 1 V ...
COS-v 'Sv O '*■ ■'' O V-fc' '■
gOr'"’ f'i.
2.4 StoCLEANING REQUIREMENTS
A combination of wet methods and use of HEPA vacuum equipment will be used to pre
clean all objects and surfaces within the proposed work area. Dry methods such as dry
sweeping shall not be allowed. When entire area has been thoroughly cleaned, the
Abatement Contractor shall request and pass a-pfe-set&ig inspection before advancing to
the next step in the abatement process.
Items to be cleaned include, but may-RCrt be limited to, the following;
A. Sprinkler Piping.
B. Class “E” wiring.
G:\2002\220201 130 Liberty DEUTSCHE BANK acm\220201 North Spec-doc 5
CITY_DEP_WORBY_CANNATA_SUBP_000031413
NYC-WTC_000348472
OCR can misread numbers and units. Confirm readings against the page image before using them.