NYC 9/11 Public Portal Document
Asbestos Abatement Specifications - 130 Liberty, North Side
15. Clean the entire Car #24 shaft via wet-wipe and HEPA vacuum methods.
16. Environmental Consultant performs clearance of the Car #24 shaft.
17. At 200 locations on floors 24 and up, demo, chop, scrape and expose the
connection plates between the column and both the upper and lower flange of
each beam where indicated on the structural engineers drawings. Relocate
existing furniture away from the work area. Place personal affects and documents
into cardboard boxes. Label boxes and provide owner with 5 sets of plans with
the boxes’ origin and final location.
It is the performance objective of this project that the only materials to remain in the work
area after clearance sampling is complete will be sprinkler piping, class “E” wiring and
closed conduit.
2.2 FULL CONTAINMENT WORKSITE PROCEDURES
The Abatement Contractor shall, at a minimum, perform all ftinctions listed below where
applicable:
A. Construct worker and waste decontamination facilities in accordance with the
conditions specified in NYC DEP Title 15, Chapter 1 and in accordance with
NYC DEP variance attachm^t DI, where applicable. D©«»teHiiTOtTO.n.,urb
be.AJasm=stagfiuniu^^ of the existing full decontamination units on the^y^ ’?
parking level shall be utilized as a remot^ Contractor shall also construct a:,mfincf
fi-om the exit of the security elevator bn the “A” level to the parking level
decontamination units.
B. Clean the entire inside of Security Elevator #24 car.
C. Pre-e-lean and then erect a tunnel from the Security Elevator to the barrier wall on ‘
Rach„of the floors.. Framing,, for the,tunnel shalLbje, 2”x AT, wood sluds. _T6’„’ on „
center. Plywood sheeting shall then be affixed to the outside of the tunnel, and 2
layers of 6-mil polyethylene sheeting shall be affixed to the inside.
D. Install a minimum of six (6) HEPA filtration units per floor in order to help filter
the air in the work area. HEPA filtration and auxiliaiy air ventilation shall
conform to Section 2.8 of this specification and shall exhaust/intake exhaust in a
location designated by and/or acceptable to the Client. Due to the existing breech
in the building, it is highly improbable that the area can be placed under negative
pressure, in accordance with NYC DEP regulations. In addition to the six (6) units
listed above, install a minimum of one (1) HEPA filtration unit per floor, plus one
additional unit per floor as a back-up, for cach tunnel leading to the work area.
G:\2002\220201 130 Liberty DEUTSCHE BANK acm\220201 North Spec.doc 4