Asbestos Abatement Specifications - 130 Liberty, North Side
y^ooO
y/X-Se: X.,’, oc &u t (JTyt • SO 4'toors-
? The general procedures to be used for this project, in general order, are:
1. This contractor shall recover all files, books and documents from within file
cabinets and desks and shelves at each cubicle, office, closet or along corridors
and shall place the contents in cardboard boxes, and shall label each box
indicating its location of origin, and then each box shall be double bagged and __
then moved to a pre-agreed location on the first floor, and shall provide the owner )
with 5 sets of floor plans indicating the origin and final location of each box.
2. The existing decon is the property of others and will be removed prior to the
commencement of this work. This contractor will provide its own men’s and
women’s decons, as well as a document recovery decon in the same locations as
they presently exist.
3. Construct the tuhnel ifoiii the Security Elevator Car #24, on Level “A”, to the
existing decontamination facilities in the parking area.
4. SeahCar #24 openings on all floors other than the work area floors (work area
includes levels Basement B through the 28“* floor) using hard barriers with the
se^ls caulked airtight.
5. Cleanlhe Security Elevator Car #24 (Car #24) while on the “A” level.
6. Construct ^^^ds^d connect to (and modify as necessary) the existing safety
partition from the exit of Car #24 to the north side barrier wall on each floor.
7. Set negative air units in elevator lobbies, north of the barrier and wherever else
needed to maintain air quality or as directed by the Environmental Consultant and
all other temporary lighting and power.
?<•
8. Construct two stage decontamination units on each security elevator lobby floor.
jCO 'U ’ 'Art bcxpA e r-i* ■
9. Prepare the work area including sealing of all emieals (including all openings to
the underfloor cell system) and capping of all HVAC duct work.
10. Clean rd!-gross debris from the work-area and remove as asbestos-contaminated
waste.
11. Remove all other porous materials (including existing non-asbestos containing
fireproofing from steel beams, columns metal deck and all other surfaces, pipe
insulation and sheet rock walls) from the work area and dispose of as asbestos
contaminated waste.
12. Clean and remove all non-porous materials from the work area and dispose as
construction and demolition debris.
13. Perform fine cleaning of the entire work area.
14. Environmental Consultant performs final clearance testing of the floor work areas.
G:\2002\220201 130 Liberty DEUTSCHE BANK acm\220201 North Spec.doc 3
CITY_DEP_WORBY_CANNATA_SUBP_000031411
NYC-WTC_000348470
OCR can misread numbers and units. Confirm readings against the page image before using them.