Asbestos Abatement
a) Preparation of the Work Area:
(1) Request that the Testing Eaboratory perform area
monitoring and establish a background count prior to the
preparatory operations for each removal area.
(2) Provide and install decontamination enclosure systems in
accordance with PART 3 - EXECUTION, Articles 3.01
and 3.02 of these Specifications and the NYCDEP
Variance. Decontamination facilities may be remote from
the Work Areas upon approval from NYCDEP.
(3) Shut down, isolate, and lock out or tag heating, ventilating,
and air conditioning (HVAC) systems which serve or
which pass through the Work Area. Vents within the Work
Area and seams in HVAC components shall be sealed with
tape and two layers of polyethylene sheeting. Filters in
HVAC systems shall be removed and treated as
asbestos-contaiuinated waste.
(4) Shut down, disconnect, and lock out or tag all electric
power to the Work Area so that there is no possibility of its
reactivation until after clearance testing of the Work Area.
(5) Seal floor drains, sumps and
other collection devices with two layers of 6-mil plastic and
plywood, as necessary, and provide a system to collect all
water used by the Contractor. Collected water shall be
passed through a water filtration system prior to being
discharged into the sanitary sewer.
(6) Separate by means of airtight barriers (isolation barriers)
parts of the building that are not included in the Work
Area(s) from parts of the building that will undergo
asbestos abatement.
(7) Seal with isolation barriers: open doorways, cased
openings, and corridors that will not be used for passage
during work.
(8) Isolation barriers shall extend from the floor to the ceiling
and form an airtight seal. They shall be built using 2-inch
by 4-inch wood or metal framing placed 16 inch on center
and shall be braced as necessary. Cover the work sides of
the studding with two layers of 6-mil reinforced
polyethylene sheeting. Do not cover wall surfaces or track
CAPITAL PROJECT NUMBER PO79201K 02081-78
100: CONTRACT DOCUMENTS REV. May 3,2000
- 78 -100% CONTRACT DOCUMENTS
REV. 0: DATE
CITY_21MC100_006631327
NYC-WTC_000416839
OCR can misread numbers and units. Confirm readings against the page image before using them.