NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 105 pages

Police Academy asbestos abatement specifications, DDC

Machine-extracted title · confidence 48%

Contract specs for abatement of asbestos-containing materials at Police Academy.

NYC-WTC_000416762–000416866
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement

a) Preparation of the Work Area:

(1) Request that the Testing Eaboratory perform area monitoring and establish a background count prior to the preparatory operations for each removal area.

(2) Provide and install decontamination enclosure systems in accordance with PART 3 - EXECUTION, Articles 3.01 and 3.02 of these Specifications and the NYCDEP Variance. Decontamination facilities may be remote from the Work Areas upon approval from NYCDEP.

(3) Shut down, isolate, and lock out or tag heating, ventilating, and air conditioning (HVAC) systems which serve or which pass through the Work Area. Vents within the Work Area and seams in HVAC components shall be sealed with tape and two layers of polyethylene sheeting. Filters in HVAC systems shall be removed and treated as asbestos-contaiuinated waste.

(4) Shut down, disconnect, and lock out or tag all electric power to the Work Area so that there is no possibility of its reactivation until after clearance testing of the Work Area.

(5) Seal floor drains, sumps and other collection devices with two layers of 6-mil plastic and plywood, as necessary, and provide a system to collect all water used by the Contractor. Collected water shall be passed through a water filtration system prior to being discharged into the sanitary sewer.

(6) Separate by means of airtight barriers (isolation barriers) parts of the building that are not included in the Work Area(s) from parts of the building that will undergo asbestos abatement.

(7) Seal with isolation barriers: open doorways, cased openings, and corridors that will not be used for passage during work.

(8) Isolation barriers shall extend from the floor to the ceiling and form an airtight seal. They shall be built using 2-inch by 4-inch wood or metal framing placed 16 inch on center and shall be braced as necessary. Cover the work sides of the studding with two layers of 6-mil reinforced polyethylene sheeting. Do not cover wall surfaces or track CAPITAL PROJECT NUMBER PO79201K 02081-78 100: CONTRACT DOCUMENTS REV. May 3,2000 - 78 -100% CONTRACT DOCUMENTS REV. 0: DATE

CITY_21MC100_006631327

NYC-WTC_000416839

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000416839Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Compare copies and versions →