NYC 9/11 Public Portal Document
Asbestos Abatement Technical Specifications
For 130 Cedar Street, New York, NY
2.73 Worker DES: That portion of a DES designated for controlled passage of
workers and other personnel and authorized visitors, consisting of a clean
room, shower room and equipment room separated from each other and from
the work area by curtained doorways and air locks.
3.0 Applicable Standards and Guidelines
3.1 All work under this contract shall be done in strict accordance with all
applicable Federal, State and Local regulations, standards and codes
governing asbestos abatement.
3.2 The Contractor shall comply with all applicable Federal, State and Local
regulations and guidelines of asbestos removal, including, but are not limited
to, the following:
a) Code of Federal Regulations (CFR) Publications:
1. 29 CFR 1910.1001 Asbestos, Tremolite, Anthophyllite, Actinolite
2. 29 CFR 1910.134 Respiratory Protection
3. 29 CFR 1926 All Sections
4. 29 CFR 1910 All Sections
b) American National Standards Institute (ANSI) Publications:
• 1. Z9.2-79 Fundamental Governing the Design and Operation
of Local Exhaust Systems
2. Z88.2-80 Practices For Respiratory Protection
c) Title 15; Chapter 1 of the Rules of the City of New York
d) Title 16; Chapter 8 of the Rules of the City of New York
e) Local Law No. 21 of the City of New York
f) Industrial Code Rule No. 56 (ICR-56) of the State of New York
g) United States Environmental Protection Agency (EPA) - National
Emissions Standards for Hazardous Air Pollutants (NESHAP).
4.0 Work Procedures
4.1 General Abatement Techniques
a) ACM must be wetted down thoroughly and as often as necessary to
prevent the emission of fibers. The ACM removal shall begin within
areas closest to the decon unit and proceed towards the HEPA
filtration units.
•
Prepared byJLC Environmental Consultants, Inc. Project No. 04-3271 Page 14