Asbestos abatement technical specifications, 130 Cedar Street, July 2004

Machine-extracted title · confidence 100%

Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.

NYC-WTC_000125579–000125652

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125591
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement Technical Specifications For 130 Cedar Street, New York, NY 2.58 Removal: The stripping of any ACM from surfaces or asbestos components of a facility.

2.59 Renovation: Renovation shall mean an addition, alteration, change or modification of the service equipment of a building that is not classified as an ordinary repair as defined in 27-125 of the Administrative Code of the City of New York.

2.60 Respiratory Protection Standard: Respiratory protection provided to workers in accordance with Personnel Protection Equipment Requirements (OSHA 20 CFR 1926.58)

2.61 Shift: A workers', or simultaneous group of workers', complete daily term of work. `

2.62 Shower Room: A room between the dean room and the equipment room in the worker decontamination enclosure with hot and cold running water controllable at a tap and arranged for complete showering during decontamination.

2.63 Staging Area: The area near the waste transfer air lock where containerized asbestos waste has been placed prior to removal from the work area.

2.64 Strip: To remove friable asbestos from any part of the facility.

• 2.65 Structural Member. Any load-supporting member of a facility, such as beams and load-supporting walls, or any non-load-supporting member, such as ceiling and non-load-supporting walls.

2.66 Surfactant A chemical wetting agent added to water to improve penetration.

2.67 Visible Emissions: Any emissions containing particulate asbestos material that are visually detectable without the aid of instruments.

2.68 Washrooms: A room between the work area and the holding area in the equipment DES where equipment and waste containers are wet cleaned and/or HEPA vacuumed prior to disposal.

2.69 Waste Decontamination Enclosure System: The DES designated for the controlled transfer of materials and equipment, consisting of a washroom and a holding area.

2.70 Wet Cleaning: The removal of asbestos fibers from building surfaces and objects by using cloths, mops or other cleaning tools that have been dampened with water.

2.71 Work Area: Designated rooms, spaces or areas of the project where asbestos abatement activities take place.

2.72 Work Site: Premises where asbestos abatement activity is taking place and that may be comprised of one or more work areas.

Prepared by JLC Environmental Consultants, Inc. Project No. 04-3271 Page 13

NYC-WTC 000125591

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125591Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127738 · Box DEP Box 52

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

Cited alongside this record in an Ask answer

Compare copies and versions →