2.44 Incidental Exposure: Any occupational exposure to asbestos fibers caused
• by disturbing ACM during the performance of one's job other than during
asbestos abatement activities.
2.45 Industrial Hygienist: The professional contracted or employed by the
Building Owner(s) and or Tenant to supervise and/or conduct air monitoring
and analysis, perform inspections and act as the Owner/Tenant
Representative.
2.46 Isolation Barrier: Shall mean the construction of partitions, the placement of
solid materials and the plasticizing of apertures to seal off the work place
from surrounding areas to contain asbestos fibers in the work area.
2.47 Log: An official record of all activities that occurred during the project. It shall
identify the Building Owner(s), Agent, Contractor, Workers and other
pertinent information.
2.48 Movable Object: A unit of equipment or furniture that can be removed from
the work area.
2.49 NESHAPS: The National Emission Standards for Hazardous Air Pollutants
(40 CFR Part 61).
2.50 NIOSH: . The National Institute for Occupational Safety and Health CDC-
NIOSH, Building J - N.E., Room 3007, Atlanta, Georgia 30333
2.51 Occupied Area: Area of the work site where abatement is not taking place and
where personnel or occupants function normally and abatement project
workers are not using personnel protective equipment.
2.52 OSHA: The Occupational Safety and Health Administration
2.53 Phase Contrast Microscopy (PCM): The measurement protocol for the
assessment of the fiber content of air. (NIOSH Method 7400)
2.54 Personal Air Monitoring: A method used-to determine employee's exposure to
airborne fibers. Samples are collected outside the respirator in the workers'
breathing zone as OSHA asbestos standards (29 CFR 1926.58).
2.55 Personal Protective Equipment: Appropriate clothing, headgear, eye
protection, footwear and MSHA/NIOSH approved respiratory protection.
2.56 Plasticize: To cover floors and walls with 6-mil fire retardant polyethylene or
by using fire retardant spray plastics.
2.57 Prior Experience: Experience required of the Contractor on asbestos projects
of similar nature and scope to insure capability of performing the asbestos
abatement in a satisfactory manner. Similarities shall be in the areas related
to material project size, abatement methods required, number of employees
and the engineering, work practice and personal protection controls required.
Prepared by JLC Environmental Consultants, Inc. Project No. 04-3271 Page 12