NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 24 pages

Permit application: NYC-WTC project, 14 Wall Street

Machine-extracted title · confidence 46%

Application prepared for project at 14 Wall Street related to WTC work.

NYC-WTC_000348464–000348487
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement Specifications - 130 Liberty, North Side

2. During the use of the scaffolding inside the Work Area(s), special care must be taken to ensure that protective barriers are not damaged. Scaffolding joints and ends shall be sealed with tape to prevent contamination with asbestos fibers and debris.

E. Air Filtration Equipment 1. The air filtration equipment chosen for the project shall be operated in accordance with and meet the standards specified in the EPA Guidance Document (EPA 560/5-85-024, June 1985, Appendix J), ANSI Z9.2 (1979) Local exhaust ventilation, OSHACFR29 1910.1001 (June 20, 1986).

2. Air filtration shall be continually maintained throughout the project. Sufficient spare units must be maintained inside and outside the Work Areas as indicated in Section 2.7.

F. Airless Sprayer: The Asbestos Contractor shall supply airless sprayers of sufficient type and quantity to keep the area spray misted at all times and to adequately wet down all asbestos material.

G. Waste Water Filtration System: The wastewater filtration system must be capable of filtration to Sum via a series of filters with progressively smaller pore sizes.

H. Waste Disposal Equipment: Carts: Plastic leak-tight carts of sufficient quantity shall be provided by the Abatement Contractor in order to safely, discreetly and efficiently transport the materials through the building to the dumpster. Double-bagged ACM shall be covered with 6-mil polyethylene sheeting while being transported from the worksite to the dumpster.

5. CONTRACTOR’S RESPONSIBILITIES The Abatement Contractor shall be responsible for, but not be limited to, the following:

A. Maintaining certified fire-watch personnel as required by NYC regulations and/or the Client’s requirements.

B. Construction of the noor-by-fldopAlccontamination units, lockable doors and construction barriers and other rigiH testrresT""'"

C. All costs incurred as the result of the failure of clearance testing, including but not limited to additional air sampling costs.

G:\2002\220201 130 Liberty DEUTSCHE BANK acm\220201 NorthSpcc.doc 13

C ITY_D E P_WO RB Y_C AN N ATA_SU B P_000031421

NYC-WTC_000348480

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000348480Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000416762

Contract specs for abatement of asbestos-containing materials at Police Academy.

Similar indexed content

Compare copies and versions →