NYC 9/11 Public Portal Document
Asbestos Abatement
6. Temporary Wiring: In the Work Area shall be type UF non-metallic
sheathed cable located overhead and exposed for surveillance. Provide
liquid tight enclosures or boxes for all wiring devices. Do not wire
temporary lighting with plain, exposed (insulated) electrical conductors.
7. Electrical Power Cords: Use only grounded extension cords; use hard
service cords where exposed to traffic and abrasion. Use single lengths of
cords only.
8. Temporary Lighting: All lighting within the Work Area shall be liquid and
moisture proof and designed for the use intended.
a) Provide sufficient temporary lighting to ensure proper
workmanship everywhere; by combined use of daylight, general
lighting, and portable plug-in task lighting.
b) Provide lighting in the Decontamination Unit as required to supply
a ininimum 50-foot candle light level.
R. Telephone Paging Device:
1. Contractor or his authorized representative shall, at all times during the
normal workday or during periods of overtime work under this Contract,
carry a digital telephone paging device (Beeper). The device shall be
activated by a telephone number in the 718, 212, 646, 917, 800, or 888
area codes. Contractor shall supply the City with the activation number for
the device and respond to calls from City within one hour. The cost to
Contractor for this device and all charges accruing thereto is deemed
included in the Bid.
2.4 CLEANING
A. Throughout the construction period, the Contractor shall maintain that the
building as described in this Section.
1. The Contractor shall prevent building areas other than the Work
Area from becoming contaminated with asbestos-containing dust or
debris. Should areas outside the Work Area become contaminated
with asbestos-containing dust or debris as a consequence of the
Contractor's work practices, the Contractor shall be responsible for
cleaning these areas in accordance with the procedures appended
in Title 15, Chapter 1 of RCNY and NYSDOL ICR56. All costs
incurred in cleaning or otherwise decontaminating non-Work Areas
and the contents thereof shall be borne by the Contractor at no
additional cost to the City.
CAPITAL PROJECT NUMBER PO79201K 02081-52
100: CONTRACT DOCUMENTS REV. May 3,2000
- 52 -100% CONTRACT DOCUMENTS
REV. 0: DATE
CITY_21MC100_006631301
NYC-WTC_000416813