Abatement specifications, exterior sealants, P.S. 92M

Machine-extracted title · confidence 45%

CoC/documents for asbestos-containing exterior sealant/caulking materials for DDC school task force, June 2001.

NYC-WTC_000455928–000456011
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SECTION 02082

a. All temporary facilities required to be installed, shall be subject to the approval of the Commissioner. Prior to starting the work at any site; specify clearly the temporary locations of facilities preferably with sketches and submit the same to the Resident Engineer and Construction Manager for approval.

2. Water:

a. The Department of Design and Construction will furnish all water needed for construction, at no cost to the Contractor in buildings under their jurisdiction. All temporary plumbing or adaptations to supply the needs of the Work Area shall be performed and removed by the Contractor and the cost thereof included in the Lump Sum price Bid for abatement work. Shower water for the decontamination unit shall be provided hot. Heating of water, if necessary, shall be provided by the Contractor.

3. Electricity:

The Department of Design and Construction will furnish all electricity needed for construction, at no cost to the Contractor in buildings under their jurisdiction. All temporary electrical work or adaptations to supply the needs of the Work Area shall be installed and removed by the Contractor and the cost thereof included in the Lump Sum price Bid for abatement work.

All temporary lighting and temporary electrical services for use in the Work Area shall be in weather proof enclosures and be ground fault protected and:

(1) Shall be performed at no additional charge to the City.

(2) Shall be performed at times not interfering with the other activities in the building.

E. Contractor shall provide a separate temporary electric panel board to power Contractor’s equipment. The Facility and Construction Manager will designate an existing electrical source in proximity to the Work Area. Contractor's licensed electrician shall provide temporary tie-in via cable, outlet boxes, junction boxes, receptacles and lights, all with ground fault interruption. At no time shall extension cords greater than 50-feet in length be allowed. All temporary electrical installation shall be in accordance with OSHA regulations. The electric shut down for power panel tie-in will be on off-hours and must be coordinated with the Facility and Construction Manager. The Contractor shall provide to the Construction Manager a specification and drawing outlining his power requirements at the pre-construction meeting.

F. Additional electrical equipment (i.e. transformers, etc.), which is necessary due to the lack of existing power on the floor shall be at the Contractor's expense.

G. Contractor shall provide fire protection in accordance with all State and Local fire codes.

H. When temporary service lines are no longer required, they shall be removed by the Contractor.

02082-34

CITY_21 MCI 00_014563890

NYC-WTC_000455961

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000455961Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →