Abatement specifications, exterior sealants, P.S. 92M

Machine-extracted title · confidence 45%

CoC/documents for asbestos-containing exterior sealant/caulking materials for DDC school task force, June 2001.

NYC-WTC_000455928–000456011
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SECTION 02082 special attention.

D. The facility will stop all deliveries that may be scheduled to the Work Area while work is in progress.

E. Facilities shall have authorized personnel on site at all times or supply the Contractor with means of contacting such personnel without unreasonable delay. Such personnel shall have access to all areas, have knowledge of electrical, and air handling equipment. Such personnel shall assist the Contractor in case of any power failure or breakdown to shut down air supply systems, to reset and control all protective systems such as alarms, sprinklers, locks, etc. The Facility shall ensure no active air handling systems are operating within the Work Area.

F. The Contractor shall provide a plan for 24 hours job security both for prevention of theft and for barring entry of curious but unprotected personnel into Work Areas.

G. Should the failure of any utility occur, the City will not be responsible to the Contractor for loss of time or any other expense incurred.

H. The facility will be responsible to notify the Contractor of any planned electrical power shutdowns in order to ensure that there are no power interruptions in the negative air pressure systems.

I. Other trades that may be performing work within portions of the building, in which asbestos abatement work is being performed shall at no time work within six bays of the asbestos abatement work.

1.18 USE OF BUILDING FACILITIES

A. City shall make available to the Contractor, from existing outlets and supplies, all reasonably required amounts of water and electric power at no charge.

B. Electric power to all Work Areas shall be shut down and locked out except for electrical equipment that must remain in service. Safe temporary power and lighting shall be provided by Contractor in accordance with applicable codes. All power to Work Areas shall be brought in from outside the area through ground-fault interrupter circuits installed at the source. Stationary electrical equipment within the Work Area, which must remain in service, shall be adequately protected, enclosed and ventilated. The Facility and Construction Manager will identify all electric lines that must remain in service. Contractor shall protect all lines.

C. Contractor shall provide, at his own expense, all electrical, water, and waste connections, tie-ins, extensions, and construction materials, supplies, etc. All water tie-ins shall be hard piped with polyethylene or copper piping. At the end of each shift. Contractor shall disconnect all hoses within the work zone and place in equipment room of the worker decontamination unit. Contractor shall ensure positive shutoff of all water to Work Area during non-working hours.

D. Utilities:

1. General:

02082-33

CITY_21 MCI 00_014563889

NYC-WTC_000455960

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000455960Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →