Exterior sealant/caulking abatement specs, P.S. 92M

Machine-extracted title · confidence 53%

Specifications for asbestos-containing exterior sealants and caulking materials abatement.

NYC-WTC_000454574–000454656
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SECTION 02082 a) Work shall occur as scheduled.

b) Horizontal surfaces near the blanking operations shall be protected with 6-mil polyethylene sheeting.

c) Plastic drapes shall be used to enclose the immediate area.

d) Contractor to position and operate air filtration devices and HEPA-vacuums in the area to clean space after blanking operations.

e) All personnel involved with this work shall receive personal protection (i.e. respirators and disposable suits).

F. Upon loss of negative pressure or electric power, all work activities in an area shall cease immediately and shall not resume until negative pressure and/or electric power has been fully restored. When a power failure or loss of negative pressure lasts, or is expected to last, longer than thirty (30) minutes, the following sequence of events shall occur.

1. All make up air inlets shall be sealed airtight.

2. All decontamination facilities shall be sealed airtight after evacuation of all personnel from the Work Area.

3. All adjacent areas shall be monitored for potential fiber release upon discovery of and subsequently throughout, power failure.

3.07 LOCKOUT OF HVAC SYSTEMS AND ELECTRIC POWER

A. Prior to the start of any prep work, the Contractor shall employ skilled tradesmen with limited asbestos licenses for the following work:

1. Disable all ventilating systems or other systems bringing air into, or exhausting air out of, the Work Area. Disable system by disconnecting wires removing circuit breakers, by lockable switch or other positive means to ensure against accidental re-starting of equipment.

2. Lockout power to the Work Area by switching off all breakers and removing them from panels or by switching and locking entire panel. Label panel with following notation: “DANGER CIRCUIT BEING WORKED ON”. Give all keys to Facility.

3. Lock out power to circuits running through Work Area whenever possible by switching off and removing breakers from panel. If circuits must remain live, the Facility shall notify Contractor in order that he may secure a variance from NYCDEP. Protect all conduit and wires to remain and label all active circuits at intervals not to exceed 3 feet with tags having the following notation: “DANGER LIVE ELECTROCUTION HAZARD”. Label all circuits in all locations including hidden locations that may be affected by the work in a similar manner.

02082-68

CITY_21 MCI 00_014563841

NYC-WTC_000454641

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000454641Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →