Abatement specifications, exterior sealants, P.S. 92M

Machine-extracted title · confidence 45%

CoC/documents for asbestos-containing exterior sealant/caulking materials for DDC school task force, June 2001.

NYC-WTC_000455928–000456011
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SECTION 02082 1. Disable all ventilating systems or other systems bringing air into, or exhausting air out of, the Work Area. Disable system by disconnecting wires removing circuit breakers, by lockable switch or other positive means to ensure against accidental re-starting of equipment.

2. Lockout power to the Work Area by switching off all breakers and removing them from panels or by switching and locking entire panel. Label panel with following notation: “DANGER CIRCUIT BEING WORKED ON”. Give all keys to Facility.

3. Lock out power to circuits running through Work Area whenever possible by switching off and removing breakers from panel. If circuits must remain live, the Facility shall notify Contractor in order that he may secure a variance from NYCDEP. Protect all conduit and wires to remain and label all active circuits at intervals not to exceed 3 feet with tags having the following notation: “DANGER LIVE ELECTROCUTION HAZARD”. Label all circuits in all locations including hidden locations that may be affected by the work in a similar manner.

Part 4 - PREPARATION OF WORK AREA AND REMOVAL PROCEDURES

4.01 REMOVAL OF ACSM UTILIZING FULL CONTAINMENT PROCEDURES SHALL BE AS FOLLOWS:

A. Contractor shall be responsible for the proper removal of ACSM from the Work Area using standard industry techniques. The Testing Laboratory representative shall observe the Work.

1. General Requirements

a. Contractor shall install and utilize fixed scaffolding or approved equivalent to facilitate removal of asbestos-containing material from outside the building.

b. All enclosures and contiguous spaces within a radius of 10 feet shall be cordoned and regulated to allow only certified workers and authorized visitors to enter.

c. Removal of ACSM shall be performed using wet methods. ACSM to be removed will be thoroughly wetted with amended water or removal encapsulant allowing adequate time to penetrate the asbestos materials. The adjacent surfaces will also be wetted prior to removal of ACSM. Dry removal of asbestos-containing material is prohibited.

d. ACSM will be removed by using hand power tools only. The recommended procedure is to scrape the wetted ACSM directly into the hose nozzle of a HEPA vacuum. This method will greatly reduce the possibility of fiber release and minimize the decontamination required within the Work Area.

e. All surfaces from which ACSM was removed shall be free of visible debris or gross sealant material.

02082-69

CITY_21 MCI 00_014563925

NYC-WTC_000455996

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000455996Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →