NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 105 pages

Police Academy asbestos abatement specifications, DDC

Machine-extracted title · confidence 48%

Contract specs for abatement of asbestos-containing materials at Police Academy.

NYC-WTC_000416762–000416866
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement

substrate. Alternately, ACM may be dropped in to a flexible catch basin and promptly bagged. Excess air within the bag shall be removed before sealing. ACM shall not be dropped from a height of greater than 10 feet. Above 10 feet, dust free inclined chutes may be used. Maximum inclination from horizontal shall be 60- degrees for all chutes.

B. Removal of ACM Utilizing Tent Containment Procedures and/or Tent and Glove­ bag Procedures shall be as follows:

1. Preparation Procedures:

a) Ensure that the Testing Laboratory has performed area monitoring and established a background count prior to the preparatory operations for each removal area, as applicable.

b) Shut down, isolate, and lock out or tag heating, ventilating, and air conditioning (HVAC) systems which seiwe or which pass through the Work Area. Vents within the Work Area and seams in HVAC components shall be sealed with tape and two layers of polyethylene sheeting. Filters in HVAC systems shall be removed and treated as asbestos-contaminated waste.

c) Shut down, disconnect, and lock out or tag all electric power to the Work Area so that there is no possibility of its reactivation until after clearance testing of the Work Area.

d) Provide and install decontamination enclosure systems in accordance with PART 3 - EXECUTION, Articles 3.01 and 3.02 of these Specifications and the NYCDEP Variance. Decontamination facilities may be remote from the Work Areas upon approval from NYCDEP.

e) Construct rigid framework to support Work Area barriers. Framework shall be constructed using 2-inch by 4-inch wooden or metal studs placed 16 inch on center when existing walls and/or ceiling do not exist.

f) Seal floor drains, sumps, shower tubs, and other collection devices with two layers of 6-mil plastic and minimum 3/8" plywood, as necessary, and provide a system to collect all water used by the Contractor. Collected water shall be passed through a water filtration system prior to being discharged into the sanitary sewer. Any opening greater than 32 square feet shall be framed with 2- inch by 4-inch studding placed 16 inches on center.

CAPITAL PROJECT NUMBER PO79201K 02081-65 100: CONTRACT DOCUMENTS REV. May 3,2000 - 65 -100% CONTRACT DOCUMENTS REV. 0: DATE

CITY_21MC100_006631314

NYC-WTC_000416826

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000416826Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Compare copies and versions →