Asbestos Abatement
substrate. Alternately, ACM may be dropped in to a flexible catch
basin and promptly bagged. Excess air within the bag shall be
removed before sealing. ACM shall not be dropped from a height
of greater than 10 feet. Above 10 feet, dust free inclined chutes
may be used. Maximum inclination from horizontal shall be 60-
degrees for all chutes.
B. Removal of ACM Utilizing Tent Containment Procedures and/or Tent and Glove
bag Procedures shall be as follows:
1. Preparation Procedures:
a) Ensure that the Testing Laboratory has performed area monitoring
and established a background count prior to the preparatory
operations for each removal area, as applicable.
b) Shut down, isolate, and lock out or tag heating, ventilating, and air
conditioning (HVAC) systems which seiwe or which pass through
the Work Area. Vents within the Work Area and seams in HVAC
components shall be sealed with tape and two layers of
polyethylene sheeting. Filters in HVAC systems shall be removed
and treated as asbestos-contaminated waste.
c) Shut down, disconnect, and lock out or tag all electric power to the
Work Area so that there is no possibility of its reactivation until
after clearance testing of the Work Area.
d) Provide and install decontamination enclosure systems in
accordance with PART 3 - EXECUTION, Articles 3.01 and 3.02
of these Specifications and the NYCDEP Variance.
Decontamination facilities may be remote from the Work Areas
upon approval from NYCDEP.
e) Construct rigid framework to support Work Area barriers.
Framework shall be constructed using 2-inch by 4-inch wooden or
metal studs placed 16 inch on center when existing walls and/or
ceiling do not exist.
f) Seal floor drains, sumps, shower tubs, and other collection devices
with two layers of 6-mil plastic and minimum 3/8" plywood, as
necessary, and provide a system to collect all water used by the
Contractor. Collected water shall be passed through a water
filtration system prior to being discharged into the sanitary sewer.
Any opening greater than 32 square feet shall be framed with 2-
inch by 4-inch studding placed 16 inches on center.
CAPITAL PROJECT NUMBER PO79201K 02081-65
100: CONTRACT DOCUMENTS REV. May 3,2000
- 65 -100% CONTRACT DOCUMENTS
REV. 0: DATE
CITY_21MC100_006631314
NYC-WTC_000416826