Abatement specifications, exterior sealants, P.S. 92M

Machine-extracted title · confidence 45%

CoC/documents for asbestos-containing exterior sealant/caulking materials for DDC school task force, June 2001.

NYC-WTC_000455928–000456011
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SECTION 02082 (5) The area above the Work Area shall be enclosed with two layers of 10-mil reinforced polyethylene sheeting to facilitate the complete enclosure of the Work Area and the maintenance of negative pressure within the Work Area.

n. Pre-Removal Inspections

(1) Prior to removal of any ACM, the Contractor shall notify the Testing Laboratory and request a pre-removal inspection. Posting of warning signs, building of decontamination enclosure systems, and all other preparatory steps have been taken prior to notification of the Testing Laboratory.

(2) Contractor shall correct any deficiencies observed by Testing Laboratory at no additional cost to City.

(3) Following the Testing Laboratory’s approval of the Work Area preparations, removal of ACM may commence.

2. Removal of ACM Within Full Containment:

a. Abatement shall not be performed in adverse weather conditions (e.g., precipitation, heavy winds, etc.)

b. Prior to actual removal, the water sealant shall be blanketed and wetted with a minimum two-inch thick coating of the acceptable foam or viscous liquid which shall be maintained for the duration of the removal until the material is bagged. The foam or viscous liquid shall be confined to the work area.

c. Manual methods of removal are recommended; however, if hand-held power tools are used to drill, cut into, or otherwise disturb the asbestos-containing roofing material, the power tools shall be equipped with HEPA-filtered local exhaust ventilation and operated to prevent potential fiber release.

d. Portable HEPA-vacuum machines shall be available during abatement.

After the ACM removal and bagging, the bagged waste shall be HEPA-vacuumed then wet cleaned and transferred into the shower room for double bagging. The double-bagged waste shall be transferred outside the clean room for its final transfer for storage in an enclosed waste container

3. Following Removal of ACM utilizing Full Containment Procedures:

a. First Cleaning:

(1) Remove any visible accumulation of asbestos material and debris. HEPA- vacuuming and wet cleaning shall be performed on all surfaces inside the Work Area. All sealed drums, plastic bags, and equipment used in the Work Area shall be removed from the Work Area.

02082-72

CITY_21 MCI 00_014563928

NYC-WTC_000455999

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000455999Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →