Exterior sealant/caulking abatement specs, P.S. 92M

Machine-extracted title · confidence 53%

Specifications for asbestos-containing exterior sealants and caulking materials abatement.

NYC-WTC_000454574–000454656
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SECTION 02082 1) Tent construction shall be performed after pre-cleaning, using the procedures described in §1-106 of Title 15, Chapter 1. In addition to these requirements, one extra layer of 6-mil polyethylene sheeting shall also be installed creating a tent containment that consists of two layers of 6-mil polyethylene sheeting.

o) Pre-Removal Inspections

(1) Prior to removal of any ACM, the Contractor shall notify the Testing Laboratory and request a pre-removal inspection. Posting of warning signs, building of decontamination enclosure systems, and all other preparatory steps have been taken prior to notification of the Testing Laboratory.

(2) Contractor shall correct any deficiencies observed by Testing Laboratory at no additional cost to City.

(3) Following the Testing Laboratory’s approval of the Work Area preparations, removal of ACM may commence.

2. Removal of ACM Within Tent Containment:

a) Abatement shall not be performed in adverse weather conditions (e.g., precipitation, heavy winds, etc.)

b) Prior to actual removal, the water sealant shall be blanketed and wetted with a minimum two-inch thick coating of the acceptable foam or viscous liquid which shall be maintained for the duration of the removal until the material is bagged. The foam or viscous liquid shall be confined to the work area.

c) Manual methods of removal are recommended; however, if hand-held power tools are used to drill, cut into, or otherwise disturb the asbestos-containing roofing material, the power tools shall be equipped with HEPA-filtered local exhaust ventilation and operated to prevent potential fiber release.

d) Portable HEPA-vacuum machines shall be available during abatement.

After the ACM removal and bagging, the bagged waste shall be HEPA-vacuumed then wet cleaned and transferred into the shower room for double bagging. The double-bagged waste shall be transferred outside the clean room for its final transfer for storage in an enclosed waste container

3. Following Removal of ACM utilizing Tent Containment Procedures:

a) Remove any visible accumulation of asbestos material and debris. HEPA- vacuuming and wet cleaning shall be performed on all surfaces inside the Work Area. All sealed drams, plastic bags, and equipment used in the Work Area shall be removed from the Work Area.

a) Upon the request of the Contractor, the Testing Laboratory for observing whether cleaned areas are free of dust, dirt, and debris will do final visual inspection for

02082-76

CITY_21 MCI 00_014563849

NYC-WTC_000454649

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000454649Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →