NYC 9/11 Public Portal Document
SECTION 02082
d) Provide and install remote decontamination enclosure systems in accordance with
Articles 3.01 and 3.02 of this Section.
e) Install isolation barriers (i.e., sealing of all openings, including but not limited to
windows, corridors, doorways, skylights, ducts, grills, diffusers, and other
penetrations within the Work Area) using two layers of 6-mil polyethylene
sheeting and duct-tape. Windows within the Work Area and within twenty-five
feet of the Work Area shall be sealed with two layers of 6-mil polyethylene
sheeting on both interior and exterior surfaces.
f) Construct rigid framework to support Work Area barriers.
(1) Install construction tarpaulin to the outside of the scaffold framing. This
tarp shall be installed in lieu of hardwood barriers and shall enclose the
outside of the entire scaffolding system.
(2) The construction tarp shall be installed to with stand wind loads accustom
to the area and shall remain in place throughout the entire abatement
project.
f) Provide a system to collect all water used by the Contractor. Collected water shall
be passed through a water filtration system prior to being discharged into the
sanitary sewer.
g) Install and initiate operation of AEDs to provide a negative pressure and a
minimum or two air changes per hour within the Work Area relative to
surrounding non-Work Areas. Do not shut down AEDs until the Work Area is
released to the City following final clearance procedures. The use ofHEPA-
filtered vacuum to produce a negative air pressure inside the enclosure is
prohibited.
h) Maintain emergency and fire exits from the Work Areas or establish alternative
exits satisfactory to the local fire officials. Emergency exits and routes shall be
established and clearly marked with florescent paint or other effective
designations to permit easy location from anywhere within the Work Area.
Emergency exits shall be secured to prevent access from uncontaminated areas
and yet permit emergency exiting. Exits shall be checked daily against exterior
blockage or impediments to exiting.
i) Temporary lighting within the Work Area and decontamination system shall be
provided as required to achieve minimum illumination levels.
j) Hand power tools used to drill, cut into, or otherwise disturb ACM shall be
equipped with HEPA filtered local exhaust ventilation.
k) Prior to tent construction, the Work Areas shall be cleaned using HEPA vacuum
equipment and/or wet cleaning methods as appropriate. Methods that raise dust,
such as dry sweeping or vacuuming with equipment not equipped with HEPA
filters, shall not be used.
02082-75
CITY_21 MCI 00_014563848
NYC-WTC_000454648
OCR can misread numbers and units. Confirm readings against the page image before using them.