Abatement specifications, exterior sealants, P.S. 92M

Machine-extracted title · confidence 45%

CoC/documents for asbestos-containing exterior sealant/caulking materials for DDC school task force, June 2001.

NYC-WTC_000455928–000456011
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SECTION 02082 released to the City following final clearance procedures. The use of HEPA filtered vacuum to produce a negative air pressure inside the enclosure is prohibited.

i. Maintain emergency and fire exits from the Work Areas or establish alternative exits satisfactory to the local fire officials. Emergency exits and routes shall be established and clearly marked with florescent paint or other effective designations to permit easy location from anywhere within the Work Area. Emergency exits shall be secured to prevent access from uncontaminated areas and yet permit emergency exiting. Exits shall be checked daily against exterior blockage or impediments to exiting.

j- Temporary lighting within the Work Area and decontamination system shall be provided as required to achieve minimum illumination levels.

k. Hand power tools used to drill, cut into, or otherwise disturb ACM shall be equipped with HEPA filtered local exhaust ventilation.

1. Prior to tent construction, the Work Areas shall be cleaned using HEPA vacuum equipment and/or wet cleaning methods as appropriate. Methods that raise dust, such as dry sweeping or vacuuming with equipment not equipped with HEPA filters, shall not be used.

m. Tent construction shall be performed after pre-cleaning, using the procedures described in §1-106 of Title 15, Chapter 1. In addition to these requirements, one extra layer of 6-mil polyethylene sheeting shall also be installed creating a tent containment that consists of two layers of 6-mil polyethylene sheeting.

n. Pre-Removal Inspections

(1) Prior to removal of any ACM, the Contractor shall notify the Testing Laboratory and request a pre-removal inspection. Posting of warning signs, building of decontamination enclosure systems, and all other preparatory steps have been taken prior to notification of the Testing Laboratory.

(2) Contractor shall correct any deficiencies observed by Testing Laboratory at no additional cost to City.

(3) Following the Testing Laboratory’s approval of the Work Area preparations, removal of ACM may commence.

2. Removal of ACM Within Tent Containment:

a. Abatement shall not be performed in adverse weather conditions (e.g., precipitation, heavy winds, etc.)

b. Prior to actual removal, the water sealant shall be blanketed and wetted with a minimum two-inch thick coating of the acceptable foam or viscous liquid which shall be maintained for the duration of the removal until the material is bagged.

02082-76

CITY_21 MCI 00_014563932

NYC-WTC_000456003

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000456003Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →