Exterior sealant/caulking abatement specs, P.S. 92M

Machine-extracted title · confidence 53%

Specifications for asbestos-containing exterior sealants and caulking materials abatement.

NYC-WTC_000454574–000454656
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SECTION 02082 reoccupancy. Evidence of asbestos contamination identified during the inspection will necessitate further cleaning as heretofore specified.

b) When the Work Area passes the Testing Laboratory’s visual reoccupancy inspection, during abatement air sampling shall cease and the samples shall be brought to the laboratory for analysis. The Testing Laboratory will approve reoccupancy if the specified fiber count in the Work Area is achieved according to the testing laboratory.

c) When the Work Area passes the reoccupancy test, all controls and seals established shall be removed.

d) A thin coat of lockdown encapsulant shall be applied to all plastic covered surfaces in the Work Area.

e) Final Barrier Removal

(1) Upon receipt of acceptable clearance testing results, polyethylene sheeting and Isolation Barriers shall be removed and disposed accordingly as asbestos-containing material.

(2) The area surrounding the abatement work place shall be cleaned of any visible debris utilizing HEPA vacuum and wet methods.

g) The Testing Laboratory will conduct a final visual observation. Approval must be granted prior to break down of decontamination facility and contractor demobilization.

4.07 MAINTENANCE OF CONTAINED WORK AREA AND DECONTAMINATION ENCLOSURE SYSTEMS

A. Ensure that barriers are installed in a manner to appropriate to the expected weather conditions expected during the project and for its duration. Repair damaged barriers and remedy defects immediately upon their discovery. Visually inspect barriers at the beginning and end of each work period.

B. Visually inspect non-Work Areas and the decontamination enclosure system for water leakage. Check the floor below, ceiling and walls, and view beneath/or around the decontamination enclosure system, for signs of leakage. Perform the visual inspection a minimum of twice each 8- hour work shift.

PART 5 - ASBESTOS WASTE MANAGEMENT

02082-77

CITY_21 MCI 00_014563850

NYC-WTC_000454650

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000454650Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →