Asbestos Abatement
passing this inspection shall be recorded in a daily logbook.
(4) The Testing Laboratory will conduct a visual observation of
the Work Area to verify the absence of asbestos-containing
waste materials.
(5) If the Work is accepted by the Testing Laboratory based on
the inspection, Contractor shall be notified. Conduct the
following activities in accordance with the contract and all
applicable laws, codes, rules and regulations.
(a) All waste shall be removed from the Work Area
and holding areas.
(b) All tools and equipment are to be removed and
decontaminated in the decontamination enclosure
system.
(6) If the Work is not approved, the Testing Laboratory will
inform Contractor who will then HEPA-vacuum and/or wet
clean the Work Area. The Testing Laboratory will then
perform a subsequent visual observation. This process will
continue until the Testing Laboratory accepts the Work Area
as clean.
(7) The Work Area shall be vacated for a minimum of one
hour to allow fibers to settle prior to clearance air
monitoring, when required.
(t) Final Barrier Removal
(1) Upon receipt of acceptable clearance testing results
polyethylene sheeting (inside layers) and Isolation Barriers
shall be removed and disposed accordingly as ACM.
(2) The area surrounding the abatement work place shall be
cleaned of any visible debris utilizing HEPA-vacuum and
wet methods.
(u) The Testing Laboratory will conduct final
visual. Approval must be granted prior to break down of
decontamination facility and contractor demobilization. Other
Information: Extra time required to clean Work Areas in order to
achieve clearance criteria shall not be considered grounds for an
extension of time for contract completion.
CAPITAL PROJECT NUMBER PO79201K 02081-71
100: CONTRACT DOCUMENTS REV. May 3,2000
-71 -100% CONTRACT DOCUMENTS
REV. 0: DATE
CITY_21MC100_006631320
NYC-WTC_000416832
OCR can misread numbers and units. Confirm readings against the page image before using them.