NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 105 pages

Police Academy asbestos abatement specifications, DDC

Machine-extracted title · confidence 48%

Contract specs for abatement of asbestos-containing materials at Police Academy.

NYC-WTC_000416762–000416866
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement

c) Remove the ACM using hand tools such as knives or scrapers.

d) Exercise caution when removing ACM.

e) Remove any residual asbestos-containing material from the substrate using wet cleaning methods.

f) Seal exposed ends of remaining insulation or ACM with a "wettable cloth" and/or encapsulant.

g) Place the removed material immediately into a properly labeled 6-mil polyethylene bag. All material shall be properly containerized and decontaminated prior to removal from the Work Area.

h) Following the completion of removal of ACM, all visible residue shall be removed from the substrate.

4. Following Removal of ACM Utilizing Tent Containment or Tent/Glovebag Procedure:

a) Clean all visible accumulations of loose ACM. Metal shovels shall not be used within the Work Area.

b) Accumulations of dust shall be cleaned continuously until completion of clean up.

c) Apply a thin coat of an encapsulating agent shall be applied to any surfaces in the Work Area which were not the subject of removal or other remediation activities. In no event shall encapsulant be applied to any surface that was the subject of removal or other remediation activities prior to obtaining satisfactory clearance air monitoring results.

d) After removal of all visible accumulations of ACM, the area shall be:

(1) HEPA-vacuumed on dry surfaces.

(2) Wet/dry shop vacuums (dedicated to asbestos abatement) may be used to pick up excess water and gross saturated debris.

(3) All surfaces shall be wet cleaned. Contractor shall request and pass a visual inspection performed by the consultant before proceeding to the next step. Documentation of CAPITAL PROJECT NUMBER PO79201K 02081-70 100: CONTRACT DOCUMENTS REV. May 3,2000 - 70 -100% CONTRACT DOCUMENTS REV. 0: DATE

CITY_21MC100_006631319

NYC-WTC_000416831

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000416831Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Compare copies and versions →