SECTION 02082
Part 4 - PREPARATION OF WORK AREA AND REMOVAL PROCEDURES
4.01 REMOVAL OF ACSM UTILIZING FULL CONTAINMENT PROCEDURES SHALL BE AS
FOLLOWS:
A. Contractor shall be responsible for the proper removal of ACSM from the Work Area using
standard industry techniques. The Testing Laboratory representative shall observe the Work.
1. General Requirements
a. Contractor shall install and utilize fixed scaffolding or approved equivalent to
facilitate removal of asbestos-containing material from outside the building.
1. All enclosures and contiguous spaces within a radius of 10 feet shall be cordoned and regulated to
allow only certified workers and authorized visitors to enter.
c. Removal of ACSM shall be performed using wet methods. ACSM to be removed
will be thoroughly wetted with amended water or removal encapsulant allowing
adequate time to penetrate the asbestos materials. The adjacent surfaces will also
be wetted prior to removal of ACSM. Dry removal of asbestos-containing
material is prohibited.
d. ACSM will be removed by using hand power tools only. The recommended
procedure is to scrape the wetted ACSM directly into the hose nozzle of a HEPA
vacuum. This method will greatly reduce the possibility of fiber release and
minimize the decontamination required within the Work Area.
e. All surfaces from which ACSM was removed shall be free of visible debris or
gross sealant material.
f. Containerize ACSM immediately upon detachment from the substrate.
Alternately, ACSM may be dropped in to a flexible catch basin and promptly
bagged. Excess air within the bag shall be removed before sealing. ACSM shall
not be dropped from a height of greater than 10 feet.
g- A thin coat of an encapsulating agent shall be applied to all surfaces from which
ACSM has been removed.
h. The asbestos handlers shall use personal protective equipment and half-face
filtered respirators during Work Area preparation and during abatement. For Air
monitoring procedures see Part 3 - Testing Laboratory Services.
2. Any modifications to the above procedures (including Air Monitoring) may be made only
upon application to and approval of N.Y.C. Department of Environmental Protection
Asbestos Control Program, Bureau of Air Resources through form ACP-9.
B. Removal of ACM Utilizing Full Containment Procedures shall be as follows:
1. Preparation Procedures: