Exterior sealant/caulking abatement specs, P.S. 92M

Machine-extracted title · confidence 53%

Specifications for asbestos-containing exterior sealants and caulking materials abatement.

NYC-WTC_000454574–000454656
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SECTION 02082 a) Ensure that the Testing Eaboratory has performed area monitoring and established a background count prior to the preparatory operations for each removal area, as applicable.

b) Shut down, isolate, and lock out or tag heating, ventilating, and air conditioning (HVAC) systems, which pass through the Work Area. Vents within the Work Area and seams in HVAC components shall be sealed with tape and two layers of polyethylene sheeting. Eilters in HVAC systems shall be removed and treated as asbestos-contaminated waste.

c) Shut down, disconnect, and lock out or tag all electric power to the Work Area such as external floodlights, so that there is no possibility of its reactivation until after clearance testing of the Work Area.

d) Provide and install contiguous decontamination enclosure systems in accordance with Articles 3.01 and 3.02 of this Section.

e) Install isolation barriers (i.e., sealing of all openings, including but not limited to windows, corridors, doorways, skylights, ducts, grills, diffusers, and other penetrations within the Work Area) using two layers of 6-mil polyethylene sheeting and duct-tape. Windows within the Work Area and within twenty-five feet of the Work Area shall be sealed with two layers of 6-mil polyethylene sheeting on both interior and exterior surfaces.

f) Construct rigid framework to support Work Area barriers.

(1) Apply a solid construction material, minimum thickness of 3/8-inch to the Work Area side of the scaffold framing.

(2) Eramework shall be constructed using 2-inch by 4-inch wooden or metal studs placed 16 inch on center when existing scaffold framing is greater than 32 square feet.

g) Provide a system to collect all water used by the Contractor. Collected water shall be passed through a water filtration system prior to being discharged into the sanitary sewer.

h) Install and initiate operation of AEDs to provide a negative pressure and a minimum or two air changes per hour within the Work Area relative to surrounding non-Work Areas. Do not shut down AEDs until the Work Area is released to the City following final clearance procedures. The use ofHEPA- filtered vacuum to produce a negative air pressure inside the enclosure is prohibited.

i) Maintain emergency and fire exits from the Work Areas or establish alternative exits satisfactory to the local fire officials. Emergency exits and routes shall be established and clearly marked with florescent paint or other effective designations to permit easy location from anywhere within the Work Area. Emergency exits shall be secured to prevent access from uncontaminated areas

02082-70

CITY_21 MCI 00_014563843

NYC-WTC_000454643

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000454643Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →