§1-125 TITLE 15—DEPT. OF ENViKONMENTAL PROTECTION
(e) Heating, Ventilation and Air Conditioning (HVAC) Systern shall be
shut down and locked out. Isolation barriers shall be installed to prevent
interior duct work contamination.
(f) Abatement shall not commence until work place preparation has been
completed.
(g) Methods that raise dust, such as sweeping'or vacuuming with equip
ment not equipped with HEPA filters, are prohibited.
(h) Objects which can be removed from the work area prior to abatement
without disturbing friable ACM shall be pre-cleaned using HEPA-filtered
vacuum equipment and/or wet cleaning.
(i) The isolation barriers (i.e. sealing off of all openings, including but not
limited to windows, corridors, doorways, barriers, skylights, ducts, grills,
diffusers, and any other penetrations of the work areas) shall be installed
with 2 layers of 6-mil plastic sheeting separately sealed with tape. All seams
of HVAC or other system components that pass through the work area shall
also be sealed. Chimney effects in stacks, columns, flues, shafts, double
walled enclosures, etc., that impact the work area, shall be eliminated by
sealing the accesses with solid material covered with a double layer of 6-mil
plastic sealed with tape.
(j) Cinderblock and porous construction materials shall be covered with
one layer of 6-mil plastic sheeting, sealed at edges and seams.
(k) Flooring within the work area shall be water-tight.
(1) Suspended ceiling tiles and T-grid components in proximity to friable
ACM shall remain in place until the work area has been fully prepared as
outlined in this section and electrical and HVAC systems have been shut
down. Contaminated suspended ceiling components shall be removed prior
to abatement and treated with a penetrating encapsulant.
(rn) Emergency and fire exits from the work areas shall be maintained, or
alternative exits shall be established in accordance with applicable NYC
Code(s) and regulations. Exits shall be checked daily against exterior block
age or impediments to exiting.
(n) Entrances to the work area that will be used for worker entry or
emergency exits shall be locked against unauthorized entry.
(o) Elevators running through the work area shall conform to the following:
(1) The elevator door in the work area shall be enclosed with conven
tional 2x4 stud framing, covered with 3/8" plywood sheeting and sealed at
all edges and seams. The barrier shall be covered and lapped for 8 inches
with two layers of 6-mil plastic sheeting adhered individually with edges
taped for airtightness.
(2) Elevators not remaining in service shall have the fuses removed and
the power switch locked in the open position.
5902 RONY 5-31-98