NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 75 pages

RCNY Chapter 1 asbestos regulations, 1998

Machine-extracted title · confidence 38%

COSH-related NYC RO regulatory chapter on asbestos control.

NYC-WTC_000411802–000411876
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part 2

Work Procedures

§1-125 Work Area Preparation §1-126 ACM Procedures: Order of Work §1-127 Lockdown Encapsulation Procedures §1-128 Clean-Up Procedures During Abatement §1-129 Clean-Up Procedures: Preparation for Clearance Air - Monitoring

§1-125 Work Area Preparation. The following work area preparation shall be followed during the conduct of pre-demolition abatement activities: (a) Prior to the start of abatement activities, the building owner or designated representative shall post a general notification at all main en­ trances to the structure. Postings of this notification shall be in English and Spanish, at eye level in a conspicuous well-lit place that can be viewed by the public without obstruction. Information provided in the notification shall include contractor, project location, that the project is regulated by NYC-DEP, and the NYC-DEP Asbestos Control Program telephone number. The notice shall have the following heading: NOTICE OF ASBESTOS ABATEMENT, in a minimum of 2 inches sans serif, gothic or block style lettering, with the balance of the lettering of the notice to be of the same type lettering in a minimum of 1 inch size. The notification shall be posted throughout all abatement activities. (b) The building shall be vacated prior to the start of abatement activities. (c) Electric power to all work areas shall be shut down and locked out. Safe temporary power and lighting shall be provided in accordance with all applicable NYC Code(s) and Regulations. All power to a work area shall be brought in from outside the area through ground-fault interrupter at the source. (d) The worker decontamination enclosure system shall be installed or constructed prior to plasticizing the work area and before disturbing ACM. The waste decontamination enclosure system shall be installed or con­ structed prior to commencement of abatement. The area in which these systems are located shall require HVAC system isolation and plasticizing of electrical outlets and equipment that are within 6 inches of floor level.

5901 RCNY 5-31-98

CITY_21MC100_006243003

NYC-WTC_000411872

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411872Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Compare copies and versions →