Exterior sealant/caulking abatement specs, P.S. 92M

Machine-extracted title · confidence 53%

Specifications for asbestos-containing exterior sealants and caulking materials abatement.

NYC-WTC_000454574–000454656
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SECTION 02082 and yet permit emergency exiting. Exits shall be checked daily against exterior blockage or impediments to exiting.

j) Temporary lighting within the Work Area and decontamination system shall be provided as required to achieve minimum illumination levels.

k) Hand power tools used to drill, cut into, or otherwise disturb ACM shall be equipped with HEPA filtered local exhaust ventilation.

1) Prior to being plasticized, the Work Areas shall be cleaned using HEPA vacuum equipment and/or wet cleaning methods as appropriate. Methods that raise dust, such as dry sweeping or vacuuming with equipment not equipped with HEPA filters, shall not be used.

m) Plasticize the area after pre-cleaning and construction of hardwood barriers, using the following procedures.

(1) Cover floors with one layer of 10-mil polyethylene sheeting, turning layer a minimum of 6 inches up wall, and seal layer to wall.

(2) Cover walls on which removal will not take place, with one layer of 6-mil polyethylene sheeting, overlapping wall layer a minimum of 6 inches, and seal layer to floor layer.

(3) Cover floors with a second layer of 10-mil polyethylene sheeting, turning layer a minimum of 12 inches up wall, and seal layer to wall.

(4) Cover walls on which removal will not take place, with a second layer of 6-mil polyethylene sheeting, overlapping wall layer a minimum of 12 inches, and seal layer to floor layer.

(5) The area above the Work Area shall be enclosed with two layers of 10-mil reinforced polyethylene sheeting to facilitate the complete enclosure of the Work Area and the maintenance of negative pressure within the Work Area.

n) Pre-Removal Inspections

(1) Prior to removal of any ACM, the Contractor shall notify the Testing Laboratory and request a pre-removal inspection. Posting of warning signs, building of decontamination enclosure systems, and all other preparatory steps have been taken prior to notification of the Testing Laboratory.

(2) Contractor shall correct any deficiencies observed by Testing Laboratory at no additional cost to City.

(3) Following the Testing Laboratory’s approval of the Work Area preparations, removal of ACM may commence.

02082-71

CITY_21 MCI 00_014563844

NYC-WTC_000454644

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000454644Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →