SECTION 02082
2. Removal of ACM Within Full Containment:
a) Abatement shall not be performed in adverse weather conditions (e.g.,
precipitation, heavy winds, etc.)
b) Prior to actual removal, the water sealant shall be blanketed and wetted with a
minimum two-inch thick coating of the acceptable foam or viscous liquid which
shall be maintained for the duration of the removal until the material is bagged.
The foam or viscous liquid shall be confined to the work area.
c) Manual methods of removal are recommended; however, if hand-held power tools
are used to drill, cut into, or otherwise disturb the asbestos-containing roofing
material, the power tools shall be equipped with HEPA-filtered local exhaust
ventilation and operated to prevent potential fiber release.
d) Portable HEPA-vacuum machines shall be available during abatement.
After the ACM removal and bagging, the bagged waste shall be HEPA-vacuumed
then wet cleaned and transferred into the shower room for double bagging. The
double-bagged waste shall be transferred outside the clean room for its final
transfer for storage in an enclosed waste container
3. Following Removal of ACM utilizing Full Containment Procedures:
a) First Cleaning:
(1) Remove any visible accumulation of asbestos material and debris. HEPA-
vacuuming and wet cleaning shall be performed on all surfaces inside the
Work Area. All sealed drums, plastic bags, and equipment used in the
Work Area shall be removed from the Work Area.
(2) Upon request of the Contractor, the Testing Laboratory will perform a
visual inspection. Evidence of asbestos contamination identified during
the inspection will necessitate further cleaning as heretofore specified.
(3) Remove first layer of plastic sheathing inside the Work Area. The
isolation barriers and decontamination facility shall remain in place and be
utilized.
b) Second Cleaning:
(1) After the first cleaning, the Work Area shall be vacated for twelve hours
to allow fibers to settle.
(2) All objects and surfaces in the Work Area shall be HEPA - vacuumed and
wet cleaned for a second cleaning.
(3) A thin coat of lockdown encapsulant shall be applied to all plastic covered
surfaces in the Work Area.