NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 83 pages

Exterior sealant/caulking abatement specs, P.S. 92M

Machine-extracted title · confidence 53%

Specifications for asbestos-containing exterior sealants and caulking materials abatement.

NYC-WTC_000454574–000454656
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SECTION 02082 (4) When the encapsulant is dry, second layer of polyethylene sheeting on the walls, ceiling and floors shall be removed. Do not remove seals from doors, windows. Isolation Barriers or disconnect the negative pressure equipment.

c) Third Cleaning:

(1) A minimum of four hours after the second cleanup, all the surfaces in the Work Area shall be HEPA-vacuumed and wet cleaned for a third cleaning.

(2) Upon the request of the Contractor, the Testing Laboratory for observing whether cleaned areas are free of dust, dirt, and debris will do final visual inspection for reoccupancy. Evidence of asbestos contamination identified during the inspection will necessitate further cleaning as heretofore specified.

(3) When the Work Area passes the Testing Laboratory’s visual reoccupancy inspection, air sampling shall not begin until at least one hour after the completion of the third cleanup. The testing laboratory shall perform air monitoring using aggressive testing techniques. The Testing Laboratory will approve Reoccupancy if the specified fiber count in the Work Area is achieved according to the testing laboratory.

(4) When the Work Area passes the reoccupancy test, all controls and seals established shall be removed.

d) Final Barrier Removal

(1) Upon receipt of acceptable clearance testing results, polyethylene sheeting and Isolation Barriers shall be removed and disposed accordingly as asbestos-containing material.

(2) The area surrounding the abatement work place shall be cleaned of any visible debris utilizing HEPA vacuum and wet methods.

e) The Testing Laboratory will conduct a final visual observation. Approval must be granted prior to break down of decontamination facility and contractor demobilization.

4.02 REMOVAL OF ACSM UTILIZING TENT CONTAINMENT PROCEDURES SHALL BE AS FOLLOWS:

A. Contractor shall be responsible for the proper removal of ACSM from the Work Area using standard industry techniques. The Testing Laboratory representative shall observe the Work.

1. General Requirements

a. Contractor shall install and utilize fixed scaffolding or approved equivalent to facilitate removal of asbestos-containing material from outside the building.

2. All tent enclosures and contiguous spaces within a radius of 10 feet shall be cordoned and regulated 02082-73

CITY_21 MCI 00_014563846

NYC-WTC_000454646

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000454646Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →