Police Academy asbestos abatement specifications, DDC

Machine-extracted title · confidence 48%

Contract specs for abatement of asbestos-containing materials at Police Academy.

NYC-WTC_000416762–000416866
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement

materials.

e) If the Work is not approved, the Testing Laboratory will inform Contractor who will then HEPA-vacuum and/or wet-clean the Work Area. The Testing Laboratory will then perform a subsequent visual observation. This process will continue until the Testing Laboratory accepts the Work Area as clean.

f) Remove polyethylene banders from the walls of the Work Area. Isolation barriers shall remain in place.

g) Perform a thorough HEPA-vacuuming of the Work Area.

h) The Testing Laboratoiy will conduct a visual ohsei-vation of the Work Area to verify the absence of asbestos-containing waste materials.

i) If the Work is not approved, the Testing Laboratory will inform Contractor who will then HEPA-vacuum the Work Area. The Testing Laboratory will then perform a subsequent visual observation. This process will continue until the Testing Laboratoiy accepts the Work Area as clean.

j) If results of air sampling perfonned during abatement activities indicate airborne fiber concentrations of less that 0.01 fibers per cubic centimeter, or the background level, whichever is greater, final clearance air sampling is not required. The abatement action may be considered complete.

k) Isolation Barrier Removal

(1) Upon receipt of acceptable observation results, polyethylene sheeting and barrier tape shall be removed and disposed accordingly as ACM.

(2) The area surrounding the abatement work place shall be cleaned of any visible debris utilizing HEPA vacuum and wet methods.

1) The Testing Laboratory will conduct final visual. Approval must be granted prior to break down of decontamination facility and contractor demobilization. Other Information: Extra time required to clean Work Areas in order to achieve clearance criteria shall not be considered grounds for an extension of time for contract completion.

CAPITAL PROJECT NUMBER PO79201K 02081-83 100: CONTRACT DOCUMENTS REV. May 3,2000 - 83 -100% CONTRACT DOCUMENTS REV. 0: DATE

CITY_21MC100_006631332

NYC-WTC_000416844

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000416844Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Compare copies and versions →