NYC 9/11 Public Portal Document
Asbestos Abatement
4.02 MAINTENANCE OF CONTAINED WORK AREA AND DECONTAMINATION
ENCLOSURE SYSTEMS
A. Ensure that barriers are installed in a manner to appropriate to the expected
weather conditions expected during the project and for its duration. Repair
damaged barriers and remedy defects immediately upon their discovery. Visually
inspect barriers at the beginning and end of each work period.
B. Visually inspect non-Work Areas and the decontamination enclosure system for
water leakage. Check the floor below, ceiling and walls, and view beneath/or
around the decontamination enclosure system, for signs of leakage. Perform the
visual inspection a minimum of twice each 8-hour work shift.
PART 5 - ASBESTOS WASTE MANAGEMENT
5.1 ACM WASTE REQUIREMENTS
A. The Contractor and all sub-Contractor are specifically alerted to the illegal
practice of combining asbestos-containing waste (ACW) from one project with
the ACW of other projects without using the services of a permitted waste transfer
station as defined by 6 NYCRR Part 360 and 364. As part of the shop drawing
submittals , the Contractor must submit for approval the proposed method of
transportation and disposal that will be utilized to manage the ACW of this
Contract. If a permitted transfer station is to be used, the cost shall be included in
the Bid price. The Contractor must submit a waste manifest consistent with
whatever approved method is utilized as part of the invoicing and payment
procedures.
B. The Contractor shall maintain compliance with the strictest set of regulations of
Title 15, Chapter 1 of RCNY, NYC LL 70/85, NYS DOL ICR 56, USEPA,
Asbestos Regulation 40CP 61.152, 29 CER 1926.58, 29 CER 1910.1200 (E) of
OSHA's Hazard Communication Standards, and other applicable standards.
NOTE: Any penalties incurred for failure to comply with any of the above
regulations will be the sole responsibility for fines imposed due to
negligence of the Contractor.
C. When presenting ACW for storage at the generation site, the Contractor shall:
1. Wet down ACW in a manner sufficient to prevent all visible emissions of
dust into the air.
2. Seal material in a leak tight container while wet.
CAPITAL PROJECT NUMBER PO79201K 02081-84
100: CONTRACT DOCUMENTS REV. May 3,2000
- 84 -100% CONTRACT DOCUMENTS
REV. 0: DATE
CITY_21MC100_0 06631333
NYC-WTC_000416845