Asbestos Abatement
3. Keep ACW separate from any other waste.
D. When presenting ACW for storage away from the site of generation, the
Contractor shall:
1. Ensure that ACW has been properly packaged as per requirements above.
2. Examine the containers of ACW to ensure that there are no breaks in the
containers and that no visible dust are being released into the air.
3. If examination reveals damage to a container of ACW the Contractor or
person accepting the waste shall immediately wet down the ACW and
repackage it into a clean leak tight container. The subsequent repackaging
shall be the financial responsibility of the Contractor and occur at no extra
cost to the City.
4. Keep ACW separate from any other waste.
E. When storing ACW - The Contractor shall:
1. Ensure that the ACW has been sufficiently wetted down in tight container.
2. Re-wet and repackage any damaged containers.
3. Maintain at storage site an adequate supply of spare leak tight containers.
4. Maintain at storage site an adequate supply of amended water.
5. Keep ACW separate from any other waste.
6. Keep ACW in a secured, enclosed, and locked container.
7. If the Contractor has intention of sorting a quantity of ACW greater than
or equal to 50 cubic yards, the Contractor shall:
a. Submit a written request and receive written approval from the
City.
E. When presenting for transport, the Contractor shall:
1. Ensure that ACW has been sufficiently wetted down.
2. Examine the integrity of the container's airtight seal.
3. Re-wet and repackage any damaged containers.
4. Keep ACW separate from all other waste.
CAPITAL PROJECT NUMBER PO79201K 02081-85
100: CONTRACT DOCUMENTS REV. May 3,2000
- 85 -100% CONTRACT DOCUMENTS
REV. 0: DATE
CITY_21MC100_006631334
NYC-WTC_000416846