Asbestos Abatement
5. Ensure that a person transporting asbestos waste holds a valid permit
issued pursuant to law.
6. Erequency of Waste Removal:
a. Properly packaged and labeled asbestos waste shall be removed
from the site on a daily basis. Under no circumstance shall asbestos
waste be stored on site without written approval from the City. The
Waste Hauler and landfill shall be as indicated on the notifications
to regulatory agencies.
G. Waste Load-out Through Equipment Decontamination Enclosure (Eull
Decontamination Eacility): Place asbestos waste in disposal bags. Large items not
able to fit into disposal bags shall be wrapped in one layer of 6-mil thick
polyethylene sheeting. Clean outer covering of asbestos waste package by wet
cleaning and/or HEPA-vacuuming in a designated part of the Work Area. Move
wrapped asbestos waste to the equipment washroom, wet clean each bag or object
and place it inside a second disposal bag, or a second layer of 6-mil polyethylene
sheeting, as the item's physical characteristics demand. Air volume shall be
minimized, and the bags or sheeting shall be sealed airtight with tape.
1. The clean containerized items shall be moved to the equipment
decontamination enclosure holding area pending load-out to storage or
disposal facilities.
2. Workers who have entered the equipment decontamination enclosure
system from the uncontaminated non-Work Area shall perform load-out of
containers from the decontamination enclosure holding area. Dress
workers moving asbestos waste to storage or disposal facilities in clean
overalls of a color different than from that of coveralls used in the Work
Area. Ensure that workers do not enter from uncontaminated areas into the
equipment washroom or the Work Area. Ensure that contaminated
workers do not exit the Work Area through the equipment
decontamination enclosure system.
3. Thoroughly clean the equipment decontamination enclosure system
immediately upon completion of the waste load-out activities, and at the
completion of each work shift.
4. Labeled ACM waste containers or bags shall not be used for non-ACM
debris or trash. Any materials placed in labeled containers or bags,
including those turned "inside-out", shall be handled and disposed of as
ACM waste.
H. All asbestos materials, wastes, shower water, polyethylene, disposable equipment
and supplies shall be disposed of as contaminated waste, in accordance with the
CAPITAL PROJECT NUMBER PO79201K 02081-86
100: CONTRACT DOCUMENTS REV. May 3,2000
- 86 -100% CONTRACT DOCUMENTS
REV. 0: DATE
CITY_21MC100_0 06631335
NYC-WTC_000416847
OCR can misread numbers and units. Confirm readings against the page image before using them.